Component  psi  Running
 − Water meter (displacement)  2.5  64.5
 − Service friction (1" copper, 18.8 gpm)  8.8  55.7
 Residual pressure at building entry  55.7
 − Critical fixture requirement (flush-tank WC, §604.3)  20.0  35.7
 Pressure available for interior distribution  35.7 psi ✓
No elevation head is carried. The site and service run are essentially flat, and the governing fixture is the at-grade
flush-tank water closet (20 psi). The highest fixtures — 2nd-floor office lavatories, 13 ft above entry, requiring only
8 psi — remain non-governing even with their ~5.6 psi static lift (8 + 5.6 = 13.6 < 20 psi). Static pressure (72 psi) is
below the 80 psi §604.8 threshold, so no PRV is required; 35.7 psi remains for interior piping friction after the
critical fixture — ample for a building of this size, confirmed at the plumbing permit stage.

8. Fire Suppression Determination
Automatic fire-sprinkler protection is not required for this building. This has been confirmed based on the
occupancy classification, the building area and height remaining within the limits permitted for non-sprinklered
construction, and the fire-resistance-rated separations incorporated in the design. Accordingly, no fire-protection
flow is added and the service is sized for domestic demand only — a material factor in the adequacy of the 1"
service. Any future introduction of a fire-suppression requirement would require re-evaluation (Section 10).

9. Conclusion
The existing 1" copper domestic water service is adequate for the proposed building addition under its non-
coincident daytime/evening pattern of use:
  ●  Design demand: 18.8 gpm — velocity 7.31 ft/s, within the 8 ft/s ceiling.
  ●  Residual at building: 55.7 psi, leaving 35.7 psi for interior distribution after the critical fixture — ample.
  ●  No PRV required (static 72 < 80 psi); no booster; no backflow assembly; no fire-protection demand;
  simultaneous use of both groups is not possible.

10. Recommendation — Future Service Upsizing
The 1" service is adequate for present conditions but carries little reserve (91% of its velocity ceiling at design
demand). The following would render it inadequate and should trigger upsizing:
  ●  Simultaneous (rather than alternating) use of both occupancy groups.
  ●  Change of tenant or occupancy, added fixtures, or conversion from flush tanks to flushometer valves.
  ●  Increased brewery production or overlapping fill demand, added irrigation, or any future fire-suppression
  requirement.
Upsizing is recommended as a programmed future capital improvement, undertaken when funding is available and
ideally coordinated with street/main work, a tenant fit-out, or re-occupancy.
 Service size (copper)  Velocity @ 24.9 gpm*  Capacity @ 8 ft/s  Headroom vs. present
 1" (existing)  9.7 ft/s (over)  ~20 gpm  Occupancy managed
 1½"  4.5 ft/s  ~44 gpm  Simultaneous use OK
 2"  2.6 ft/s  ~77 gpm  long-term growth + fire
  option
* full simultaneous demand (reference). A 1½" service carries full simultaneous demand comfortably (4.5 ft/s); a 2" service adds reserve
for future fixtures, irrigation, brewery growth, or a future fire service. If the service trench or building entry is disturbed under this
project, an oversized sleeve/entry penetration now materially reduces the future upsizing cost.

11. Assumptions, Limitations & Certification
  ●  Existing service (1" Type L copper), developed length, available/static pressures (67/72 psi), and meter
  loss (2.5 psi) are per the Engineer's project data and field information; a purveyor pressure-availability
  letter is recommended for the record.

  Page 42 of 84