Southtowns Record

10-28-26 Planning Board Work Session - Site Plan and Rezone

Government
Town of Evans
Board
Planning Board Workshop
Meeting
Oct 28, 2026
Kind
Minutes
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Parks and recreation, Public safety

Original document

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. TOWN OF EVANS, ERIE COUNTY, NEW YORK DRAWING C-100 CK. PMM APPROVED NUMBER 07/26 ISSUED FOR PERMITTING TRC PMM PMM SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. ACCOUNT NUMBER COVER SHEET 1 APPROVED NUMBER

    Result not stated

    Page 22 of the minutes, motion 1

  2. N 89°37'36" W EN OH / W RD O H RD OH ) R O N S OHH GA APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 23 of the minutes, motion 2

  3. 25'-WIDE VISUAL MITIGATION (VM) ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 24 of the minutes, motion 3

  4. ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 25 of the minutes, motion 4

  5. · ALL WILDFLOWERS AND GRASSES SOWED SHALL BE ALLOWED TO GROW TO THEIR NATURALLY OCCURRING HEIGHTS WHENEVER POSSIBLE. NATIVE WILDFLOWERS AND/OR GRASSES CAN BE MOWED/MAINTAINED (WITHIN ACCEPTABLE AREAS IDENTIFIED AND/OR APPROVED BY APPROPRIATE REGULATORY AGENCIES) AS OFTEN AS NEEDED TO KEEP THE VEGETATION AT A SHRUB PLANTING DETAIL DESIRED AND/OR MANAGEABLE/MANICURED HEIGHT. N.T.S. NOTE: 9. INVASIVE SPECIES SHALL NOT BE PERMITTED. · IN AREAS WITH MASS PLANTINGS, CONTINUOUS EXCAVATION AND MULCHING PRACTICES SHALL BE IMPLEMENTED WHENEVER POSSIBLE 10. ALL PLANT MATERIAL SHALL CONFORM TO THE PLAN SIZE SPECIFICATIONS AS ESTABLISHED BY THE AMERICAN STANDARD FOR NURSERY STOCK LATEST ED…

    Result not stated

    Page 26 of the minutes, motion 5 (full wording)

  6. SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. APPROVED

    Result not stated

    Page 73 of the minutes, motion 6

Text · page 33 of 83

Read the whole document on one page (all 83 pages, each with its own heading)

Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
  d. Will the proposed action generate liquid wastes?  Yes ✔ No
  If Yes:
  i. Total anticipated liquid waste generation per day:  gallons/day
  ii. Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
  approximate volumes or proportions of each):

  iii. Will the proposed action use any existing public wastewater treatment facilities?  Yes  No
  If Yes:
    Name of wastewater treatment plant to be used:
    Name of district:  9  9
    Does the existing wastewater treatment plant have capacity to serve the project?  Yes  No
    Is the project site in the existing district?  Yes  No
    Is expansion of the district needed?  Yes  No

    Do existing sewer lines serve the project site?  Yes  No
    Will a line extension within an existing district be necessary to serve the project?  Yes  No
  If Yes:
   Describe extensions or capacity expansions proposed to serve this project:

  9  9
  iv. Will a new wastewater (sewage) treatment district be formed to serve the project site?  Yes ✔ No
  If Yes:
   Applicant/sponsor for new district:  9  9
    Date application submitted or anticipated:
    What is the receiving water for the wastewater discharge?
  v. If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
  receiving water (name and classification if surface discharge or describe subsurface disposal plans):

  vi. Describe any plans or designs to capture, recycle or reuse liquid waste:
  9  9

  e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point  Yes ✔ No
  sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
  source (i.e., sheet flow) during construction or post construction?
  If Yes:  9
  i. How much impervious surface will the project create in relation to total size of project parcel?
  Square feet or  acres (impervious surface)
  Square feet or  acres (parcel size)
  ii. Describe types of new point sources.

  iii. Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
  groundwater, on-site surface water, or off-site surface waters)?

  9  9
    If to surface waters, identify receiving water bodies or wetlands:

   Will stormwater runoff flow to adjacent properties?  Yes  No
  iv. Does the proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater?  Yes  No

  9  9
  9  9
  9  9

  Page 6 of 15  FEAF 2026