Southtowns Record

10-28-26 Planning Board Work Session - Site Plan and Rezone

Government
Town of Evans
Board
Planning Board Workshop
Meeting
Oct 28, 2026
Kind
Minutes
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Parks and recreation, Public safety

Original document

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. TOWN OF EVANS, ERIE COUNTY, NEW YORK DRAWING C-100 CK. PMM APPROVED NUMBER 07/26 ISSUED FOR PERMITTING TRC PMM PMM SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. ACCOUNT NUMBER COVER SHEET 1 APPROVED NUMBER

    Result not stated

    Page 22 of the minutes, motion 1

  2. N 89°37'36" W EN OH / W RD O H RD OH ) R O N S OHH GA APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 23 of the minutes, motion 2

  3. 25'-WIDE VISUAL MITIGATION (VM) ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 24 of the minutes, motion 3

  4. ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 25 of the minutes, motion 4

  5. · ALL WILDFLOWERS AND GRASSES SOWED SHALL BE ALLOWED TO GROW TO THEIR NATURALLY OCCURRING HEIGHTS WHENEVER POSSIBLE. NATIVE WILDFLOWERS AND/OR GRASSES CAN BE MOWED/MAINTAINED (WITHIN ACCEPTABLE AREAS IDENTIFIED AND/OR APPROVED BY APPROPRIATE REGULATORY AGENCIES) AS OFTEN AS NEEDED TO KEEP THE VEGETATION AT A SHRUB PLANTING DETAIL DESIRED AND/OR MANAGEABLE/MANICURED HEIGHT. N.T.S. NOTE: 9. INVASIVE SPECIES SHALL NOT BE PERMITTED. · IN AREAS WITH MASS PLANTINGS, CONTINUOUS EXCAVATION AND MULCHING PRACTICES SHALL BE IMPLEMENTED WHENEVER POSSIBLE 10. ALL PLANT MATERIAL SHALL CONFORM TO THE PLAN SIZE SPECIFICATIONS AS ESTABLISHED BY THE AMERICAN STANDARD FOR NURSERY STOCK LATEST ED…

    Result not stated

    Page 26 of the minutes, motion 5 (full wording)

  6. SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. APPROVED

    Result not stated

    Page 73 of the minutes, motion 6

Text · page 34 of 83

Read the whole document on one page (all 83 pages, each with its own heading)

Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
  f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes ✔ No
  combustion, waste incineration, or other processes or operations?
  If Yes, identify:
  i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
  ______________________________________________________________________________________________________
  ii. Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
  ______________________________________________________________________________________________________

  iii. Stationary sources during operations (e.g., process emissions, boilers, electric generation, surface coating)
  ______________________________________________________________________________________________________
  g. Will any air emission sources named in D.2.f (above), require an Air Facility Registration, Air State Facility  Yes ✔ No
  Permit, Title IV Permit or Title V Permit?
  If Yes:
  i. Is the proposed action subject to the Nonattainment New Source Review or Prevention of Significant Deterioration  Yes No
  requirements discussed in 6 NYCRR Part 231?
  ii. As calculated in the air permit application, the proposed action has the potential to emit:
    Tons/year (short tons) of carbon monoxide (CO)
    Tons/year (short tons) of oxides of nitrogen (NOx)
    Tons/year (short tons) of particulate matter (PM-10, PM-2.5)
    Tons/year (short tons) of volatile organic compounds (VOC)
    Tons/year (short tons) of sulfur dioxide (SO2)
  iii. Will emissions of air contaminants from the proposed action described above exceed the corresponding major  Yes No
  source thresholds?
  iv.Does the proposed action have the potential to emit 10 tons/year or more of any one designated hazardous air  Yes  No
  pollutant or 25 tons/year or more of any combination of such hazardous air pollutants (6NYCRR 200.1(ag))?
  If Yes, provide the total potential to emit hazardous air pollutants in short tons/year: _____________________________

  h. Will the proposed action generate or emit annual direct and indirect greenhouse gas emissions, such as carbon dioxide, methane,
  nitrous oxide, sulfur hexafluoride, hydrofluorocarbons, or perfluorocarbons in excess of 10,000 metric tons of total carbon dioxide
  equivalents per year at any point in the lifetime of the proposed action (estimated using the carbon dioxide equivalent definition and
  global warming potentials provided in 6 NYCRR Part 496)?  Yes ✔ No
  If Yes:
  i. Estimate the proposed action’s metric tons of carbon dioxide equivalents in tons/year (metric):
  ii. Describe any greenhouse gas capture, control, or elimination measures included in project design:

  i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as  Yes ✔ No
  quarry or landfill operations?
  If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):

  j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial  Yes ✔ No
  new demand for transportation facilities or services?
  If Yes:
  i. When is the peak traffic expected (Check all that apply):  Morning  Evening  Weekend
  Randomly between hours of  to  .
  ii. For commercial activities only, projected number of truck trips/day and type (e.g., semi trailers and dump trucks):

  iii. Parking spaces:  Existing  Proposed  Net increase/decrease
  iv. Does the proposed action include any shared use parking?  Yes No
  v. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe:
  ______________________________________________________________________________________________________________
  vi. Are public/private transportation service(s) or facilities available within ½ mile of the proposed site?  Yes  No
  vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric  Yes  No
  or other alternative fueled vehicles?
  viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing  Yes  No
  pedestrian or bicycle routes?

  Page 7 of 15  FEAF 2026