Southtowns Record

10-28-26 Planning Board Work Session - Site Plan and Rezone

Government
Town of Evans
Board
Planning Board Workshop
Meeting
Oct 28, 2026
Kind
Minutes
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Parks and recreation, Public safety

Original document

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. TOWN OF EVANS, ERIE COUNTY, NEW YORK DRAWING C-100 CK. PMM APPROVED NUMBER 07/26 ISSUED FOR PERMITTING TRC PMM PMM SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. ACCOUNT NUMBER COVER SHEET 1 APPROVED NUMBER

    Result not stated

    Page 22 of the minutes, motion 1

  2. N 89°37'36" W EN OH / W RD O H RD OH ) R O N S OHH GA APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 23 of the minutes, motion 2

  3. 25'-WIDE VISUAL MITIGATION (VM) ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 24 of the minutes, motion 3

  4. ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 25 of the minutes, motion 4

  5. · ALL WILDFLOWERS AND GRASSES SOWED SHALL BE ALLOWED TO GROW TO THEIR NATURALLY OCCURRING HEIGHTS WHENEVER POSSIBLE. NATIVE WILDFLOWERS AND/OR GRASSES CAN BE MOWED/MAINTAINED (WITHIN ACCEPTABLE AREAS IDENTIFIED AND/OR APPROVED BY APPROPRIATE REGULATORY AGENCIES) AS OFTEN AS NEEDED TO KEEP THE VEGETATION AT A SHRUB PLANTING DETAIL DESIRED AND/OR MANAGEABLE/MANICURED HEIGHT. N.T.S. NOTE: 9. INVASIVE SPECIES SHALL NOT BE PERMITTED. · IN AREAS WITH MASS PLANTINGS, CONTINUOUS EXCAVATION AND MULCHING PRACTICES SHALL BE IMPLEMENTED WHENEVER POSSIBLE 10. ALL PLANT MATERIAL SHALL CONFORM TO THE PLAN SIZE SPECIFICATIONS AS ESTABLISHED BY THE AMERICAN STANDARD FOR NURSERY STOCK LATEST ED…

    Result not stated

    Page 26 of the minutes, motion 5 (full wording)

  6. SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. APPROVED

    Result not stated

    Page 73 of the minutes, motion 6

Text · page 35 of 83

Read the whole document on one page (all 83 pages, each with its own heading)

Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C
  k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand?  Yes  ✔  No
  If Yes:
  i. Estimate annual electricity demand during operation of the proposed action:

  ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or
  other):________________________________________________________________________________________________

  iii. Will the proposed action require a new, or an upgrade, to an existing substation?  Yes  No

  l. Hours of operation. Answer all items which apply.
  i. During Construction:  ii. During Operations:
   Monday - Friday: 7am - 7pm    Monday - Friday:  7am - 7pm

   Saturday:  7am - 7pm    Saturday:  7am - 7pm

   Sunday:  7am - 7pm    Sunday:  7am - 7pm

   Holidays:  7am - 7pm    Holidays:  7am - 7pm

  m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction,  Yes ✔ No
  operation, or both?
  If yes:
  i. Provide details including sources, time of day and duration:

  ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen?  Yes  No
  Describe:

  n. Will the proposed action have outdoor lighting?  Yes ✔ No
  If yes:
  i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:

  ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen?  Yes  No
  Describe:

  o. Does the proposed action have the potential to produce odors for more than one hour per day?  Yes ✔ No
  If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
  occupied structures:

  p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons)  Yes ✔ No
  or chemical products 185 gallons in above ground storage or any amount in underground storage?
  If Yes:
  i. Product(s) to be stored
  ii. Volume(s)  per unit time  (e.g., month, year)
  iii. Generally, describe the proposed storage facilities:

  q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides  Yes ✔ No
  (i.e., herbicides, insecticide) during construction or operation?
  If Yes:
  i. Describe proposed treatment(s):

  ii. Will the proposed action use Integrated Pest Management Practices?  Yes  No

  Page 8 of 15  FEAF 2026