Text · page 35 of 83
Read the whole document on one page (all 83 pages, each with its own heading)
Docusign Envelope ID: 0533D2F9-82ED-8823-8164-657BA77D727C k. Will the proposed action (for commercial or industrial projects only) generate new or additional energy demand? Yes ✔ No If Yes: i. Estimate annual electricity demand during operation of the proposed action: ii. Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or other):________________________________________________________________________________________________ iii. Will the proposed action require a new, or an upgrade, to an existing substation? Yes No l. Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations: Monday - Friday: 7am - 7pm Monday - Friday: 7am - 7pm Saturday: 7am - 7pm Saturday: 7am - 7pm Sunday: 7am - 7pm Sunday: 7am - 7pm Holidays: 7am - 7pm Holidays: 7am - 7pm m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes ✔ No operation, or both? If yes: i. Provide details including sources, time of day and duration: ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes No Describe: n. Will the proposed action have outdoor lighting? Yes ✔ No If yes: i. Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No Describe: o. Does the proposed action have the potential to produce odors for more than one hour per day? Yes ✔ No If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest occupied structures: p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) Yes ✔ No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i. Product(s) to be stored ii. Volume(s) per unit time (e.g., month, year) iii. Generally, describe the proposed storage facilities: q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides Yes ✔ No (i.e., herbicides, insecticide) during construction or operation? If Yes: i. Describe proposed treatment(s): ii. Will the proposed action use Integrated Pest Management Practices? Yes No Page 8 of 15 FEAF 2026