  1. TOWN OF EVANS, ERIE COUNTY, NEW YORK DRAWING C-100 CK. PMM APPROVED NUMBER 07/26 ISSUED FOR PERMITTING TRC PMM PMM SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. ACCOUNT NUMBER COVER SHEET 1 APPROVED NUMBER

    Result not stated

    Page 22 of the minutes, motion 1

  2. N 89°37'36" W EN OH / W RD O H RD OH ) R O N S OHH GA APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 23 of the minutes, motion 2

  3. 25'-WIDE VISUAL MITIGATION (VM) ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 24 of the minutes, motion 3

  4. ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 25 of the minutes, motion 4

  5. · ALL WILDFLOWERS AND GRASSES SOWED SHALL BE ALLOWED TO GROW TO THEIR NATURALLY OCCURRING HEIGHTS WHENEVER POSSIBLE. NATIVE WILDFLOWERS AND/OR GRASSES CAN BE MOWED/MAINTAINED (WITHIN ACCEPTABLE AREAS IDENTIFIED AND/OR APPROVED BY APPROPRIATE REGULATORY AGENCIES) AS OFTEN AS NEEDED TO KEEP THE VEGETATION AT A SHRUB PLANTING DETAIL DESIRED AND/OR MANAGEABLE/MANICURED HEIGHT. N.T.S. NOTE: 9. INVASIVE SPECIES SHALL NOT BE PERMITTED. · IN AREAS WITH MASS PLANTINGS, CONTINUOUS EXCAVATION AND MULCHING PRACTICES SHALL BE IMPLEMENTED WHENEVER POSSIBLE 10. ALL PLANT MATERIAL SHALL CONFORM TO THE PLAN SIZE SPECIFICATIONS AS ESTABLISHED BY THE AMERICAN STANDARD FOR NURSERY STOCK LATEST ED…

    Result not stated

    Page 26 of the minutes, motion 5 (full wording)

  6. SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. APPROVED

    Result not stated

    Page 73 of the minutes, motion 6

Text · page 7 of 83

Read the whole document on one page (all 83 pages, each with its own heading)

National Grid Site Plan and Public Utility Use Variance Application
August 14, 2026
Page 5

  infrastructure and replacement equipment. The marshalling yard was first
  constructed upon approval by the PSC, who regulates all electric service
  providers in the State. Under the Public Service Law, the PSC approved the
  Property to serve as a marshalling yard to support National Grid’s GD 141/142
  project. See Exhibit 7. Prior approval by the PSC in the Article VII process
  indicates this location is strategic and beneficial to the logistics of completing
  National Grid’s essential mission. Having a permanent marshalling yard in the
  Town allows National Grid to adequately service many Western New York
  lines and upgrade aging infrastructure. The Property is ideally situated for just
  that due to its proximity to over 33 pending National Grid improvement
  projects. See Exhibit 5. Given the location adjacent to the thruway on and off
  ramps, National can use the marshalling yard for more than just the
  infrastructure and projects identified within the 15-mile radius. Improved
  infrastructure supports orderly development, health and safety, while also
  facilitating the adequate provision of essential electricity services in the Town
  and larger region.

  b. There are no existing viable alternatives. The Property is located next to
  National Grid’s 3-phase distribution circuit. This allows National Grid to
  quickly respond to any outages or repairs on this line. The Property is also
  located near many other western NY lines and substations. As discussed above,
  proximity to 33 pending projects means National Grid can stage and improve
  electrical infrastructure across its western New York footprint. Further, the
  Property is already cleared/disturbed with sufficient open land. The Property
  was strategically selected given the Property’s topography, existing vegetation,
  suitable open land and proximity to National Grid infrastructure. Finally, the
  Property has historically been used as a marshalling yard and is situated in a
  low-development area.

  c. Community intrusion is minimal. “[W]here the intrusion or burden on the
  community is minimal, the showing required by the [applicant] should be
  correspondingly reduced.” Consolidated Edison Co. of New York v Hoffman,
  43 NY2d 598, 611 (1978). The Property minimizes potential environmental
  impacts as there is no contamination history at the project site, no unique
  geological features, it is not located in a floodplain, and it will have no impact
  on any archaeological or historic sites. Applicant’s minimal proposed land
  disturbance on site includes the installation of vegetative screening. Grading
  (except for the filling of a few potholes and ruts) and below grade disturbance
  is not anticipated. While the existing yard is an impervious gravel area with
  permanent fencing and gates, Applicant does expect that a few perimeter
  controls may be needed as part of the site upgrades. Importantly, the
  marshalling yard complies with all underlying setback requirements.