  1. TOWN OF EVANS, ERIE COUNTY, NEW YORK DRAWING C-100 CK. PMM APPROVED NUMBER 07/26 ISSUED FOR PERMITTING TRC PMM PMM SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. ACCOUNT NUMBER COVER SHEET 1 APPROVED NUMBER

    Result not stated

    Page 22 of the minutes, motion 1

  2. N 89°37'36" W EN OH / W RD O H RD OH ) R O N S OHH GA APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 23 of the minutes, motion 2

  3. 25'-WIDE VISUAL MITIGATION (VM) ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 24 of the minutes, motion 3

  4. ROW APPROVED APPROVED APPROVED APPROVED

    Result not stated

    Page 25 of the minutes, motion 4

  5. · ALL WILDFLOWERS AND GRASSES SOWED SHALL BE ALLOWED TO GROW TO THEIR NATURALLY OCCURRING HEIGHTS WHENEVER POSSIBLE. NATIVE WILDFLOWERS AND/OR GRASSES CAN BE MOWED/MAINTAINED (WITHIN ACCEPTABLE AREAS IDENTIFIED AND/OR APPROVED BY APPROPRIATE REGULATORY AGENCIES) AS OFTEN AS NEEDED TO KEEP THE VEGETATION AT A SHRUB PLANTING DETAIL DESIRED AND/OR MANAGEABLE/MANICURED HEIGHT. N.T.S. NOTE: 9. INVASIVE SPECIES SHALL NOT BE PERMITTED. · IN AREAS WITH MASS PLANTINGS, CONTINUOUS EXCAVATION AND MULCHING PRACTICES SHALL BE IMPLEMENTED WHENEVER POSSIBLE 10. ALL PLANT MATERIAL SHALL CONFORM TO THE PLAN SIZE SPECIFICATIONS AS ESTABLISHED BY THE AMERICAN STANDARD FOR NURSERY STOCK LATEST ED…

    Result not stated

    Page 26 of the minutes, motion 5 (full wording)

  6. SHEET DATE DESCRIPTION OF ISSUE OR REVISION DR. CK. APP. APPROVED

    Result not stated

    Page 73 of the minutes, motion 6

Text · page 6 of 83

Read the whole document on one page (all 83 pages, each with its own heading)

National Grid Site Plan and Public Utility Use Variance Application
August 14, 2026
Page 4

Op 33830[U] at *5 (Niagara County Supreme 2018). The Property was carefully selected based
on its proximity to existing National Grid infrastructure, including major electric transmission lines
and electrical substations, as well as consideration of site topography, site shape/size, slopes,
vegetation, wetlands, forested areas, proximity to threatened or endangered species, adjacent uses,
and site history—including history as a marshalling yard aiding in provision of National Grid’s
essential service.

  Proximity to electrical infrastructure is paramount. National Grid is required to provide
safe and reliable electric service in New York. This mandate spurred National Grid to originally
use the Property as a marshalling yard as part of its GD 141/142 project. See Exhibit 7. Prior
approval by the PSC in the Article VII process indicates this location is strategic and beneficial to
National Grid’s essential mission.

  Having a permanent marshalling yard allows National Grid to adequately service many
Western New York lines and upgrade aging infrastructure. In the coming years, staging at this
marshalling yard will allow National Grid to commence needed upgrades on at least 33 projects
within a 15-mile radius of the Property. See Exhibit 5. Given the location adjacent to the thruway
on and off ramps, National can use the marshalling yard for more than just the infrastructure and
projects identified within the 15-mile radius.

  The Property under the PUV Standard

  For entitlement to a use variance under the PUV standard, an applicant must demonstrate
that the facility provides an essential service, and the variance relief permitting the essential service
is required in order to provide safe and adequate service. Further, the applicant must show that
there are compelling reasons, economic or otherwise, that make it more feasible to seek the
variance than to use alternative locations. Notably, when the community intrusion is minimal, the
burden by the applicant should be correspondingly reduced.

  Applying the PUV Standard, the electricity that the marshalling yard helps become a reality
is an essential service. However, the Zoning Law of the Town (“Zoning Law”) prohibits the
essential service at the Property. Therefore, the relief of the use variance is:

  (1) a “public necessity” because absent the use variance, the cannot “render safe and
  adequate [electrical] service” as it is prohibited under the Zoning Law at the
  Property. Absent the ability to manage its dynamic flow of project materials from
  a reliable and strategic location, National Grid will not have the ability to
  consistently, safely, and conveniently upgrade or maintain its facilities; and

  (2) there are “compelling reasons” that make it more feasible to seek this use variance
  than to seek alternate locations. Such compelling reasons include:

  a. The Marshalling Yard is necessary. National Grid serves the majority of
  Western New York. To serve this large geographic region, National Grid
  requires strategically placed marshaling yards that house necessary electrical