Text · page 131 of 241
Read the whole document on one page (all 241 pages, each with its own heading)
Original Cost Estimate in August 2020: $10.2 million waterlines +$402,772 Pump Station = $10.6 million This is the breakdown of the $10.6 million mentioned on the prior slide