Text · page 138 of 241
Read the whole document on one page (all 241 pages, each with its own heading)
= Done = Phase 1 Water Line Repairs Needed (CDBG/ARPA) Grouping determined by priority as well as geographic location Note how long these repairs were pushed off to avoid taking on a large water project & the associated costs 138