Text · page 145 of 241
Read the whole document on one page (all 241 pages, each with its own heading)
Water Line Replacements – Phase 1 Went out to Bid! (August 2024) 8 Bids Received – Low Bid was 716 Site Contracting for $2,415,741 145
Read the whole document on one page (all 241 pages, each with its own heading)
Water Line Replacements – Phase 1 Went out to Bid! (August 2024) 8 Bids Received – Low Bid was 716 Site Contracting for $2,415,741 145