Text · page 105 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
PROJECT TEAM Jason A. Foote PE Principal-in-Charge Jason is an Associate Principal with two decades of experience providing design services for civil and municipal engineering projects. His expertise ranges from water treatment and distribution to wastewater collection, storm drainage and planning board review. Delegating and overseeing work assigned to team members, Jason independently evaluates, selects and executes methodologies that will help streamline development and performs quality assurance / control for all assignments within his purview. He is a seasoned leader with a great talent for applying the right combination of skills and experience to consistently provide excellent service. PROJECT EXPERIENCE from Genesee County, highlighting Town of West Seneca, NY teamwork, coordination, and EDUCATION • Bachelor of Science, Civil Principal/Project Manager innovative problem-solving. Engineering Technology, • Phase 8 Sewer Rehabilitation University of Buffalo, 1999 • Water District 8 and Water Main Village of Elba, Phase 2 Water • Associate in Applied Science, Improvements System Improvements, Elba, NY Engineering Science, Genesee • Sanitary Sewer Improvements Project Manager of Phase 2, which Community College, 1995 • Energy Procurement involved the replacement of approximately 20,000 linear feet PROFESSIONAL REGISTRATION Professional Engineer: NY Village of Arcade, Sanitary Sewer of 6”, 8” and 12” water main, valves, Phases 1 & 2A, 2B Improvements, hydrants, over 250 water services, PROFESSIONAL AFFILIATIONS Arcade, NY and rehabilitating the existing water • AWWA Project Manager for a $1.4 million storage tank. Construction was • Western New York Water Works multi-phased, sanitary sewer completed in June 2018. Association project, which included planning, • Leadership Genesee design, approvals, bidding and Genesee County Phase 2 Water construction. The projects involved Supply, Genesee County, NY the replacement and/or rehabilitation Served as Project Manager to of existing sanitary sewer mains, and support the County in expanding manholes, and the restoration of all water service to additional areas. disturbed areas. The Village obtained Phase II of the program included grants and low interest loans from the installation of 28 miles of new NYS EFC to fund the projects. water mains, construction of 5 new pump stations, upgrades Town of Elba, Water District #2, to 5 existing pump stations, Elba, NY rehabilitation of 4 water storage Led planning and engineering tanks, and enhancements to the efforts to provide potable water to all Batavia Water Treatment Plant. residents in the Town by creating a single, town-wide Water District No. Livingston County Water & Sewer 2. The $17,769,000 project included Authority, DOCCS Water Supply, installing approximately 250,000 Livingston County, NY linear feet (over 47 miles) of 8” and Managed the installation of 12” and 12” water main, valves, hydrants, 16” water mains, valves, hydrants, around 500 water services, and a pressure-reducing/meter vaults, a 750,000-gallon water storage tank. Funding was secured through 250,000 gallon water storage tank, USDA Rural Development grants pump station and appurtenances and loans, along with a contribution along multiple roads. 35 Page 105 of 301