PROJECT TEAM

  Jason A. Foote
  PE

  Principal-in-Charge
  Jason is an Associate Principal with two decades of experience providing
  design services for civil and municipal engineering projects. His expertise
  ranges from water treatment and distribution to wastewater collection,
  storm drainage and planning board review. Delegating and overseeing work
  assigned to team members, Jason independently evaluates, selects and
  executes methodologies that will help streamline development and performs
  quality assurance / control for all assignments within his purview. He is a
  seasoned leader with a great talent for applying the right combination of skills
  and experience to consistently provide excellent service.

  PROJECT EXPERIENCE  from Genesee County, highlighting
  Town of West Seneca, NY  teamwork, coordination, and
EDUCATION
• Bachelor of Science, Civil  Principal/Project Manager  innovative problem-solving.
  Engineering Technology,  • Phase 8 Sewer Rehabilitation
  University of Buffalo, 1999  • Water District 8 and Water Main  Village of Elba, Phase 2 Water
• Associate in Applied Science,  Improvements  System Improvements, Elba, NY
  Engineering Science, Genesee  • Sanitary Sewer Improvements  Project Manager of Phase 2, which
  Community College, 1995  • Energy Procurement  involved the replacement of
  approximately 20,000 linear feet
PROFESSIONAL REGISTRATION
Professional Engineer: NY  Village of Arcade, Sanitary Sewer  of 6”, 8” and 12” water main, valves,
  Phases 1 & 2A, 2B Improvements,  hydrants, over 250 water services,
PROFESSIONAL AFFILIATIONS  Arcade, NY  and rehabilitating the existing water
• AWWA  Project Manager for a $1.4 million  storage tank. Construction was
• Western New York Water Works  multi-phased, sanitary sewer  completed in June 2018.
  Association  project, which included planning,
• Leadership Genesee
  design, approvals, bidding and  Genesee County Phase 2 Water
  construction. The projects involved  Supply, Genesee County, NY
  the replacement and/or rehabilitation  Served as Project Manager to
  of existing sanitary sewer mains, and  support the County in expanding
  manholes, and the restoration of all  water service to additional areas.
  disturbed areas. The Village obtained  Phase II of the program included
  grants and low interest loans from  the installation of 28 miles of new
  NYS EFC to fund the projects.  water mains, construction of 5
  new pump stations, upgrades
  Town of Elba, Water District #2,  to 5 existing pump stations,
  Elba, NY
  rehabilitation of 4 water storage
  Led planning and engineering
  tanks, and enhancements to the
  efforts to provide potable water to all
  Batavia Water Treatment Plant.
  residents in the Town by creating a
  single, town-wide Water District No.
  Livingston County Water & Sewer
  2. The $17,769,000 project included
  Authority, DOCCS Water Supply,
  installing approximately 250,000
  Livingston County, NY
  linear feet (over 47 miles) of 8” and
  Managed the installation of 12” and
  12” water main, valves, hydrants,
  16” water mains, valves, hydrants,
  around 500 water services, and a
  pressure-reducing/meter vaults, a
  750,000-gallon water storage tank.
  Funding was secured through  250,000 gallon water storage tank,
  USDA Rural Development grants  pump station and appurtenances
  and loans, along with a contribution  along multiple roads.

  35

  Page 105 of 301