PROJECT TEAM

  David Hardenbrook
  PE

  Water & Wastewater Project Manager
  As a member of the civil engineering team in our Buffalo office, David
  focuses on technical design, drafting, reports and inspection services. He has
  completed a wide variety of projects throughout New York state, including
  water distribution systems and wastewater design assignments. His innate
  desire to learn propels him as he works alongside senior engineers on
  industrial and commercial projects. In addition to his engineering expertise,
  David has experience working in the construction management realm, which
  has helped him develop a deep understanding of construction procedures
  and safety standards.

  PROJECT EXPERIENCE  City of Corning WWTP
  Town of West Seneca, NY  Improvements, Chemical Storage
EDUCATION
Bachelor of Science, Civil  Project engineer/manager for the  Building, Corning, NY
Engineering, University at Buffalo  lining and manhole rehabilitation  Provided building design services to
  of over 90,000 linear feet of sanitary  the standards of 10 States Standards,
PROFESSIONAL REGISTRATION  sewer main, including the 24” and 36”  The City of Corning, and NYSDOH.
Professional Engineer: NY  trunk sewers.  The building provides nearly 8000
  gallons of safe storage for the City’s
PROFESSIONAL AFFILIATIONS
  Town of Darien, Sanitary Sewer  phosphorus treatment chemicals.
• American Society of Civil Engineers
• OSHA 30 Certified  Upgrades, Darien, NY  The building provides safe delivery
• American Water Works Association  Project Engineer/Manager for the  areas, chemical containment, alarms,
• USA FAA Remote Pilot License  installation of a new 6” sanitary force  and SCADA to contain the chemicals
  main and sanitary pump station to  and notify operators of leaks or other
  convey flows from the Town of Darien  emergencies in a timely manner.
  to the Village of Corfu WWTF. The  The Building was completed in the
  project included the abandonment  Fall of 2022 -Provided construction
  and decommissioning of the existing  administration services
  Darien WWTF.
  Genesee County Water Supply,
  City of Corning WWTP  Phase 2 and 3, Genesee County, NY
  Improvements, UV Disinfection  Phase 2A - Existing Pump Station
  Building, Corning, NY  Upgrades (Contract 4)
  Provided building design services  Provided building design services
  to the standards of 10 States  to the standards of MCWA, Genesee
  Standards, The City of Corning, and  County, and NYSDOH. The intent
  NYSDOH. The building provides  of the upgrades is to increase the
  wastewater treatment utilizing  pumping capacity into Genesee
  ultraviolet light rather than through  County to meet the increased water
  the use of harsh chemicals. The  demands within the County.
  Building was completed in the
  Fall of 2022-Provided construction
  administration services

36