PROJECT TEAM

  Jonathan Rink  Colin Nims
  PE

  Project Engineer: Civil Engineer  Project Engineer:
  Senior Engineering Designer
Based in our Buffalo office, Jonathan is a skilled Civil  Colin is a Project Engineer working with the
Engineer specializing in the design and analysis of  Infrastructure Team in our Buffalo Office. He brings a
complex systems. With 9 years of experience and  broad range of permitting, environmental compliance,
proficiency in industry-standard tools like AutoCAD, Civil  and municipal infrastructure experience in support of
3D, HydroCAD, and WaterCAD, he brings expertise to  public works and development projects. His background
projects ranging from waterline design and stormwater  includes coordination of state and federal environmental
modeling to pump station improvements.  permitting, SWPPP compliance, and technical support
  for projects involving regulated waterways and
  environmentally sensitive areas. Colin has experience
EDUCATION
  performing HEC-RAS hydraulic modeling for streams to
Bachelor of Science, Environmental Engineering,
  evaluate flood elevations, flow conditions, and project
University at Buffalo
  impacts, as well as implementing streambank protection
PROFESSIONAL REGISTRATION  and stabilization measures. He also has a wide range
Professional Engineer: NY  of municipal water and wastewater design experience,
  complemented by hands-on site and construction-phase
PROJECT EXPERIENCE  experience.
Town of West Seneca, Water District 8 & Bullis Road
Water Main Replacement, West Seneca, NY
  EDUCATION
The project involved the replacement of existing water
  Bachelor of Science, Civil Engineering,
mains along portions of Terrace Blvd, Hyland Place,
  University at Buffalo
Mohawk Street and Bullis Road.

  PROJECT EXPERIENCE
Niagara Falls Water Board, Beech Avenue Tank &
  Town of West Seneca, Phase 8 Sewer Rehabilitation,
Pump Station, Niagara Falls, NY
  West Seneca, NY
Project Engineer for the design, bidding, construction
  Assisted with preparation of engineering report for DEC
administration and inspection for the rehabilitation of
  relative to phase 8 sewer rehabilitation requirements and
the existing Beech Avenue water storage tank and the
  drawings and specs for lining, grouting of sewer mains
construction of a new booster pump station to improve
  and laterals as well as manhole rehabilitation.
pressure within the northern portion of the City of
Niagara Falls water system.
  Town of West Seneca, Stormwater Management, West
  Seneca, NY
Water Main Replacement Experience:
  Provides stormwater and regulatory support, SWPPP
Project responsibilities included drafting, plan review,
  reviews and Planning Board reviews to ensure proposed
engineer’s estimate, and assembling technical
  developments comply with applicable stormwater
specifications.
  regulations and permit requirements. Maintains
• The Town of Grand Island (Bronson, Towerwood, and
  compliance with the Town’s MS4 program, including
  Red Jacket Road)
  required documentation, reporting, inventory, and
• The Town of Newstead (ECWA Lease Management -
  coordination with regulatory agencies.
  Indian Falls, Knapp, and Kirby Rd.)
• The Town of Cambria (Saunders Settlement Road,
  Village of Alfred, NY
  Shawnee Road)
  • Sewer System Improvements
• The Village of Holley (Village-wide replacement and
  • Collection System Study
  Thomas Street replacement)

  Sinclairville Water System Upgrade, Sinclairville, NY*
Erie County Water Authority, NY*
  Assisted in the design and production of a complete set
• 16-inch diameter water main and 8-inch and 12-inch
  of plans to construct a new pre-fabricated water tower,
  diameter water main replacements
  three pre-fabricated pump houses and two production
• Ball Pump Station north Tank Replacement
  wells to improve the town’s existing water infrastructure.
* Experience prior to CPL.
  * Experience prior to CPL.
  37