Text · page 108 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
PROJECT TEAM RJ Green Andrew J. Bork Project Engineer: Senior Sanitary Sewer System Engineering Designer Advisor & Inspector As an Engineering Designer in our Buffalo office, RJ Andy is a seasoned municipal professional with over plans and designs a myriad of projects, ranging from 30 years of service in the Town of West Seneca Sewer small site developments and roadway improvements Department, possessing intimate, system-level to wastewater treatment and collection assignments. knowledge of the Town’s sanitary sewer network. His Working primarily with our Infrastructure team, he extensive hands-on experience in water and wastewater gathers and analyzes data, performs field reviews and construction inspection and operations allows him to prepares layouts for stormwater management, grading quickly identify existing deficiencies, anticipate potential and erosion control. Whether conducting inspections issues, and help resolve problems efficiently in the or preparing backflow prevention reports, his work is field. Andy’s practical, boots-on-the-ground approach instrumental in advancing CPL’s mission of enriching supports informed decision-making and effective lives through compassionate design. coordination with contractors and municipal staff to keep projects moving forward. EDUCATION Bachelor of Science, Civil Engineering, CERTIFICATIONS University at Buffalo • OSHA 10 Confined Space • NYSDEC Erosion and Sediment Control PROJECT EXPERIENCE Town of West Seneca, NY PROJECT EXPERIENCE • Phase 8 Sewer Rehabilitation Town of Evans, Water System Improvements, Water • Water District 8 and Water Main Improvements Tank & Pump Station, Evans, NY Construction Inspection and Documentation of a 15,000 Town of Ripley, NY LF installation of a water main between a newly installed • Clarifier Improvements pump house and water tower, with new valves and • Water District No. 4 hydrants – pressure, bacteria and chlorine tested. Town of Bethany, NY Town of Boston, Water System Improvements, Boston, Water District No. 5 - Design and construction NY administration for approximately 154,000 feet of water Construction Inspection and Documentation of a 1,266 LF main and two pump stations to serve residents, farms, installation of a water main, valves, hydrants and water and businesses services, restoration of asphalt on shoulder and driveway approaches as well as lawn restoration, pressure, bacteria Town of Boston, NY and chlorine tested. Water Main Improvement Phase 1 - Design of approximately 10,770 feet of water main Village of Alfred, Water System Improvements, Alfred, NY Town of Lima, NY Pine Hill Water Storage Tank–Construction Inspection Water District No. 5 - Design and construction of water and Documentation of a 472,000 gallon water tank main improvements for the Town of Lima Water installation. District No. 5. Erie County Water Authority, Water Main/Services Town of LeRoy, NY Replacement Design and construction administration for Water • Replacement of water main, valves and hydrants District No. 12 • Replacement of 83 water services between new water main and right of way – 19 Interconnections, pressure bacteria and chlorine tested City of Olean Roundabout Project, Olean, NY Construction inspection for the construction of the City of Olean roundabout. 38 Page 108 of 301