Text · page 109 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
PROJECT TEAM Jeremy E. DeLyser David R. Hart PE Water System Advisor Lead - Mechanical Engineering Jeremy has more than 20 years of experience with Dave is an accomplished mechanical engineer with various types of civil and municipal engineering projects, over 30 years of experience in project engineering/ including water distribution and wastewater collection management, HVAC systems design, product design, systems, water and wastewater district formation, storm manufacturing process design, and materials selection. drainage and site planning, many of which are funded He also has strong organizational skills and the ability to through state and federal agencies. His experience communicate and work effectively with clients. Dave is through involvement with planning, design, funding the Lead MEP Engineer at CPL, directing the work of the source development, construction administration and mechanical, electrical, and plumbing engineering staff. inspection phases on a diverse array of projects, has been a benefit to numerous municipalities EDUCATION and clients Bachelor of Science, Mechanical Engineering, State University of New York at Buffalo, 1990 EDUCATION Bachelor of Science, Civil Engineering Technology, PROFESSIONAL REGISTRATION Rochester Institute of Technology Professional Engineer: NY, PA, NC, GA, SC PROFESSIONAL REGISTRATION PROFESSIONAL AFFILIATIONS Professional Engineer: NY • American Society of Heating, Refrigerating and Air Conditioning Engineers PROJECT EXPERIENCE • National Society of Professional Engineers Genesee County Water Supply, Phase 2A, Genesee • Association of Energy Engineers County, NY Golden Road Pump Station PROJECT EXPERIENCE (Contract 3) Monroe County Water Authority, East Side Water Provided building design services to the standards of Supply Project, Webster, NY MCWA, Genesee County, and NYSDOH. The Building was Project MEP Engineer for a $150 million water supply completed in the Spring of 2023-Provided Construction project. The project included: Administration Services • Raw water intake tunnel and pump station • Water treatment plant Town of Alabama, Water District No.2 Phase 3, • High lift pump station Alabama, NY • Transmission system CPL provided design and construction engineering services for the installation of approximately 100,000 LF Webster, NY of 8” PVC and HDPE water mains along various roads in • Raw water intake tunnel and pump station the Town of Alabama to provide water to approximately • Water treatment plant 177 residential parcels. • High lift pump station • Transmission system Town of Benton, NY Project Manager for the following: Middletown Water Treatment Plant, Middletown, NY • Water District No. 1, Extension 1 Project MEP Engineer for the design of HVAC systems for • Water District No. 1, North Extension a new 6 million GPD water treatment plant. • Water District No. 5 • Water District No. 6 Cross-Irondequoit Pump Station Improvements, Irondequoit, NY Town of Castile, Design & Construction Engineering • Project MEP Engineer for the design of the mechanical Services, Castile, NY and HVAC system improvements at the 100 million GPD Design and Construction Engineering Services for capacity pump station upgrades to existing water district. Addition of Booster • Installation of two 700 hp and two 1250 hp pumps, Pump Station and multiple pressure reducing valve and variable frequency drives and motors meter vaults. 39 Page 109 of 301