Text · page 110 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
PROJECT TEAM Joseph Bellanca Jennifer J. Wengender PE Lead - Electrical Engineering Lead - Plumbing/Fire Protection Engineering Joe is an Associate with nearly two decades of experience Jennifer has over 30 years of experience in mechanical in electrical engineering design, implementation and engineering, where she has concentrated on plumbing construction management. He is responsible for power and life safety. Since 1998, she has been designing distribution, communication, lighting and low-voltage plumbing, mechanical, fire protection and medical systems for CPL’s building projects, and works closely gas systems for CPL. Jennifer leads the plumbing with fellow team members to ensure all designs adhere department at the firm and serves as Project Manager to various codes and standards while maintaining client for several repeat clients. Her overall knowledge of codes expectations. He also has field experience designing including NYS, NFPA, DOH and SED and her ability to and building controls for water treatment plants, pump coordinate with Code Officials make her a valuable part stations and landfills, as well as electrical construction of the design team. work. A natural educator, Joe aspires to continuously expand the experience and understanding of junior EDUCATION engineers. • Bachelor of Science, Mechanical Engineering, State University of New York at Binghamton EDUCATION • Associate of Applied Sciences, Engineering Science, Bachelor of Science, Electrical Engineering Technology, Dutchess Community College Rochester Institute of Technology PROFESSIONAL REGISTRATION PROJECT EXPERIENCE Registration: Professional Engineer NY, NC, GA Town of Elba, NY Water District No. 2 PROJECT EXPERIENCE Town of West Seneca, West Seneca, NY Manchester Water District, LaGrange, NY Sanitary Sewer Improvements Project Engineer for preparation of design drawings, technical specifications and contract documents Village of LeRoy, LeRoy, NY for permitting and construction of the water supply Wastewater Treatment Facility Improvements and treatment facilities, the water storage tanks, and pumping and distribution system. Town of Elma, NY Project Plumbing Engineer for gas service upgrades for Genesee County, NY a new generator at water treatment facilities. Phase 2 Water Supply Genesee County Economic Development Center Village of Bergen, NY Business Park Water System Improvements Project Plumbing Engineer for plumbing, fire protection, and process gases for a large $6 million new building Village of Ellicottville, NY and miscellaneous client buildouts. Water System Improvements Monroe County Water Authority, East Side Water Monroe County Water Authority, Monroe County, NY Supply Project, Webster, NY Project engineer for two new single story fresh water Project Plumbing Engineer for a $150 million water pump station buildings. supply project. The project included: • Raw Water Intake Tunnel Town of Seneca, NY • Lake Water Pump Station Water System Improvements • Raw Water Transmission Main • Webster Water Treatment Plant and High Lift Pump Village of LeRoy, NY Station Wastewater Treatment Facility Improvements • Residuals Handling • Finished Water Transmission Main 40 Page 110 of 301