Text · page 111 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
PROJECT TEAM Larry D. Werts Norm Gardner PE CPG Environmental Review & Geotechnical Lead - Structural Engineer Senior Engineering Project Manager Larry is a licensed structural engineer with 25 years of Norm has more than three decades of experience extensive and varied experience. His design expertise providing oversight for civil, site and environmental includes water treatment facilities, multi-story schools tasks. He has experience providing oversight for State and healthcare buildings, warehouse/distribution Environmental Quality Review Act (SEQRA) compliance structures, hotels and highway bridges. Larry has for a wide range of assignments, encompassing completed several projects that required extensive comprehensive plans, and civil and municipal design analysis prior to design and renovation of existing projects. He has additionally conducted numerous site structures. investigations and environmental audits for private industrial concerns throughout New York state. EDUCATION EDUCATION • Bachelor of Science, Civil Engineering Technology, • Graduate Studies, Ohio State University Rochester Institute of Technology • Bachelor of Science, Geology, Ohio State University • Associate of Applied Science, Architectural Engineering Technology, State University of New York at Alfred State PROFESSIONAL REGISTRATION College Certified Professional Geologist PROFESSIONAL REGISTRATION PROJECT EXPERIENCE • Professional Engineer: NY, FL, GA, NC, PA, VA, WV, OH Village of Avoca, NY • Certified Code Enforcement Official: NY Project Consultant for a new groundwater supply for the Village to replace existing spring sources that were PROJECT EXPERIENCE in violation of the surface water influence regulations Structural Engineering for Municipal Infrastructure under USEPA’s Surface Water Treatment Rule. Prepared Structural Engineering support for municipal water and all drilling specifications and testing protocols to meet wastewater projects, designing concrete structures and NYSDEC approvals. Supervised all field work and equipment support structures. Projects include: prepared the final report for submittal to NYSDEC for • Village of Bergen Wastewater Treatment Facility New Source Approval. Upgrade, Bergen, NY • Livingston County Water and Sewer Authority, Lakeville Erie County Department of Public Works, Wastewater Treatment Facility, Livingston County, NY Reconstruction of Alden-Crittenden Road (CR1), Village • Town of Pavilion Sanitary Sewer, Pavilion, NY of Alden and Bullis Road (CR 330), Town of Marilla, NY • Genesee County Water Supply Program, Genesee Provided environmental/ geotechnical review for this County, NY roadway rehabilitation project. Design services included • City of Middletown Water Treatment Facility and pavement evaluation, design of new closed drainage Wastewater Treatment Plant, Middletown, NY system, new concrete gutter on CR 330, new concrete • Town of Stafford Water District 1, Stafford, NY curb-gutter on CR 1, upgrades of sidewalk ramps and • Village of Alfred Wastewater Treatment Facility, NY pedestrian crossings for compliance with ADA guidelines, • Monroe County Water Authority East Side Water Supply work zone traffic control, new signage and striping, Project, Webster, NY cost estimating, design report preparation, and public • Village of Portville Sewer System Improvements/ participation meetings. Collection System, NY • Town of Batavia Shepard Putnam Water District Livingston County, SEQRA Assistance, Mt. Morris, NY • Pearl Water District, NY Project Manager responsible for the environmental study • Village of Belmont Wastewater Treatment Facility, NY to assist Livingston County in meeting the requirements • Monroe County, Irondequoit Bay Pump Station, of the State Environmental Quality Review Act as it Rochester, NY applies to the construction of a new skilled nursing facility. 41 Page 111 of 301