Robert P. Lannon Jr., | Project Director

Retained Engineering Services  Lockport Street Watermain Replacement
Town Engineer |  Project Manager
Town of Lewiston | Lewiston, NY, USA |  Village of Youngstown | Youngstown, NY, USA
2001-2003, 2004-2010, 2014-Present  Bob managed the design and construction for the
As Town Engineer, Bob is the main client contact. He  replacement of approximately 2,300 linear feet of
attends monthly Board Meetings and oversees  existing watermain with new 8-inch ductile iron pipe.
engineering support services as required by the Town  The project included five interconnections to existing
for municipal infrastructure projects including:  watermains and replacement of water services.
– Feasibility studies and preparation of contract
  documents for numerous infrastructure  Van De Water Delivered Water Transmission
  improvement projects involving water, sewer, and  Main
  storm sewer systems.
  Project Director |
– Capital planning and implementation, including  Erie County Water Authority | Tonawanda and
  capital cost estimating, concept designs,  Amherst, NY, USA
  preparation of Map Plan & Reports, development of
  contract documents, regulatory agency approvals,  Bob is directing the project team responsible for the
  contract administration, and assistance with  preliminary engineering, design and construction of the
  obtaining financing.  final segment of the Van De Water delivered water
  transmission main between the Colvin Storage Tank
– Developing contract documents for a water system  and the I 290/I 990 Interchange. Bob oversaw the
  capital improvement project to replace  evaluation of alternatives, which agreed with a
  approximately 45,000 linear feet of 8-, 12- and  previously completed routing study by others, with
  16-inch water main and services throughout the  minor alignment changes due to existing conflicts and
  Town.  restrictions. GHD is further evaluating pipe materials
– Several sanitary sewer infrastructure improvement  and installation methods to construct the final portion
  projects, including installation of more than 4 miles  of the main in the least intrusive and most cost-
  of sanitary sewers to service numerous residential  effective manner. Bob is also overseeing ancillary
  neighborhoods. Services included design and  steps that will take place along with the engineering
  preparation of contract documents and drawings,  design including community engagement, SEQR, and
  refinancing assistance, and inspection of  the public bidding process. He will assist the project
  construction activities.  manager and the ECWA in developing a
  project-centric public outreach strategy in line with the
Town Engineering Services  ECWA’s core objectives, which includes informing
Engineer of Record |  stakeholders about the project need and benefits.
Town of Niagara | Niagara Falls, NY, USA |
  Career history
As Town Engineer, Bob is the main client contact and
responds to client inquiries. He attends monthly Board  2003 – present  GHD, Principal/Project Director
Meetings and oversees engineering support services
as required by the Town for municipal infrastructure  1983 – 2003  O’Brien & Gere Inc., Project
projects, including:  Manager
– Providing cost effective recommendations to reduce
  flooding at problem locations throughout the Town's
  drainage system.
– Periodic engineering reviews of proposed projects
  regulated by the Town Planning and Zoning boards.

Town-wide Water System Improvements
Project Director
Town of Lewiston | Lewiston, NY, USA
As retained engineer for the Town, Bob is directed
project efforts for the development, design and
construction phase services for this Town-wide water
system improvement project. The project included
44,500 linear feet of waterline ranging in size from 8 –
16 inches in diameter and included railroad crossings,
stream crossings, NYSDOT and Niagara County
Highway roadways, trenchless technologies, and
several interconnections.

T 716 362-8806 | M 716 491-1267 | E [email protected]  www.ghd.com