Text · page 153 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
John Story PE QA/QC – Wastewater Location Experience Buffalo, NY, USA 22 years Qualifications/Accreditations – B.S., Civil Engineering, 2003 – Registered Professional Engineer: New York – Board Certified Environmental Engineer American Academy of Environmental Engineers (Water Supply and Wastewater) Memberships – Member, New York Water Environment Association – Member, American Public Works Association New York Chapter/Western New York Branch Relevant experience summary John is a project manager with 22 years of experience in municipal water and wastewater engineering. He has been involved in the study, design, and construction of wastewater collection systems, pump stations, wastewater treatment plants, and biosolids treatment facilities. I/I Evaluation and SSES I/I Evaluation and SSES Project Engineer | Project Engineer | Town of West Seneca | West Seneca, NY, USA City of Tonawanda | Tonawanda, NY, USA Evaluation of I/I in the Town's sanitary sewer system. Flowmeter data analysis to estimate I/I and prioritize Evaluation included analysis of flowmeter data to SSES activities in the City's sanitary system. The City identify the mini-systems with the most severe wet is required to locate and remove I/I source connections weather peaking factors. I/I evaluation was used to as part of an Order on Consent issued by the prioritize a phased SSES program which included NYSDEC. Mini-systems were prioritized for smoke CCTV inspections, smoke and dye testing, sewer testing, dye testing, CCTV inspections, and manhole lining, and manhole repairs. inspections based on the severity of I/I identified Sanitary Sewer Rehabilitation during flowmetering. The project also included the development of a written CMOM plan for ongoing Project Manager | collection system evaluation and inspection. Town of Grand Island | Grand Island, NY, USA Project Manager for various projects to identify and Peanut Line Parallel Interceptor Sewer remove wet weather inflow and infiltration (I/I) sources. Project Manager | Prepared a 10-year phased work plan for I/I mitigation Town of Amherst | Amherst, NY, USA which was approved by the New York State Department of Environmental Conservation John is managing a critical infrastructure project in the (NYSDEC). Identified I/I sources through a Town of Amherst aimed at increasing sewer capacity combination of video inspection of sewers, manhole for the Town of Clarence and ECSD No.5. The project inspection, smoke testing, and dye testing. Several involves installing approximately 3,750 linear feet of construction contracts were performed to mitigate the 24-inch PVC parallel gravity sewer, including three suspect I/I sources. Construction activities included flow meters and a precast vault with manual flow cast in place pipe (CIPP) lining, open-cut sewer and restrictive devices. GHD utilized existing site and manhole replacement, manhole lining and sewer system information to assess capacity issues rehabilitation, and lateral repairs. Provided annual and develop solutions, leading to a detailed final updates to the NYSDEC to ensure compliance with the design. Key design aspects included connections to approved work plan. the existing sewer system at Transit Road, T +1 716 242-6928 | M +1 716 536-0863 | E [email protected] ghd.com Page 153 of 301