Southtowns Record

TBA01.26.2026packet

Government
Town of West Seneca
Board
Town Board
Meeting
Jan 26, 2026, 6:00 p.m.
Posted by publisher
Jan 23, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Budget and taxes, Public safety, Parks and recreation, Zoning and land use, Roads and traffic, Audits and oversight, Housing

Original document

Same meeting

Text · page 155 of 301

Read the whole document on one page (all 301 pages, each with its own heading)

David Woolley BS
QA/QC - Water

Location  Experience
Buffalo, New York, United States  10 years

Qualifications/Accreditations
– Bachelor of Science (BS), Civil Engineering, 2015

Memberships
– Buffalo Section American Society of Civil Engineers
  (ASCE)
– American Water Works Association (AWWA)
– New York Water Environment Association (NYWEA)
– Member, North American Society for Trenchless
  Technology (NASTT)

Relevant experience summary
 Dave has worked in consulting for 10 years and has been involved in the planning, design, and construction of multi-
 disciplined projects, with a focus on linear pipeline projects. Recently, he has acted as the design manager on projects
 entailing over 20 miles of large diameter (24-84") gravity and pressure pipelines with challenging crossings and
 permitting, over 40 miles of small/medium pipelines, in addition to providing technical advisory/quality assurance to
 numerous pipeline routing and design projects of varying size and complexity in North America.

  for overseeing all technical calculations and
48-Inch Finished Water Transmission Main  development of design drawings and specifications.
Design Manager |
Erie County Water Authority | Tonawanda, NY | 2022-  Hamburg Water Consolidation Improvement
2023  Project
Dave was the design manager for the preliminary and  Project Engineer |
detailed design of approximately 18,000 feet of 48-inch  Village of Hamburg | Hamburg, NY | 2019
steel finished water transmission main with numerous
trenchless crossings including an 1,800-feet micro  Dave was the lead design engineer for the replacement
tunnel, land acquisition, permitting coordination, with an  of approximately 26,000 feet of 8- and 12-inch water
anticipated project cost of ~$45 Million. The project also  main, associated hydrants, services, and
included a high level alignment alternatives review,  appurtenances. Dave was responsible for development
evaluation of piping materials to determine the most  of detailed design drawings, testing and disinfection
advantageous material and a project phasing evaluation.  plans, front-end documents, technical specifications, and
  construction cost estimate.
Royalton Water Distribution System
Improvements  Town-wide Water System Improvements
Design Manager |  Engineer |
Town of Royalton | Royalton, NY | 2020 - Ongoing  Town of Lewiston | Lewiston, NY | 2018
David acted as the design manager for a multi-year  Dave assisted in the detailed design for the replacement
multi-phased project to expand the Town’s water  of approximately 45,000 feet of various size water
distribution system. The project(s) included  mains. Assisted with pipeline alignment, materials of
approximately 80,000 LF of new water distribution piping  construction, and assembly of all contract documents.
between 8- and 12-inch diameter. Dave was responsible  Responsible for coordinating all permitting efforts with
  various entities

T +1 716 362-8802 | E [email protected]  www.ghd.com
  Page 155 of 301