Text · page 155 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
David Woolley BS QA/QC - Water Location Experience Buffalo, New York, United States 10 years Qualifications/Accreditations – Bachelor of Science (BS), Civil Engineering, 2015 Memberships – Buffalo Section American Society of Civil Engineers (ASCE) – American Water Works Association (AWWA) – New York Water Environment Association (NYWEA) – Member, North American Society for Trenchless Technology (NASTT) Relevant experience summary Dave has worked in consulting for 10 years and has been involved in the planning, design, and construction of multi- disciplined projects, with a focus on linear pipeline projects. Recently, he has acted as the design manager on projects entailing over 20 miles of large diameter (24-84") gravity and pressure pipelines with challenging crossings and permitting, over 40 miles of small/medium pipelines, in addition to providing technical advisory/quality assurance to numerous pipeline routing and design projects of varying size and complexity in North America. for overseeing all technical calculations and 48-Inch Finished Water Transmission Main development of design drawings and specifications. Design Manager | Erie County Water Authority | Tonawanda, NY | 2022- Hamburg Water Consolidation Improvement 2023 Project Dave was the design manager for the preliminary and Project Engineer | detailed design of approximately 18,000 feet of 48-inch Village of Hamburg | Hamburg, NY | 2019 steel finished water transmission main with numerous trenchless crossings including an 1,800-feet micro Dave was the lead design engineer for the replacement tunnel, land acquisition, permitting coordination, with an of approximately 26,000 feet of 8- and 12-inch water anticipated project cost of ~$45 Million. The project also main, associated hydrants, services, and included a high level alignment alternatives review, appurtenances. Dave was responsible for development evaluation of piping materials to determine the most of detailed design drawings, testing and disinfection advantageous material and a project phasing evaluation. plans, front-end documents, technical specifications, and construction cost estimate. Royalton Water Distribution System Improvements Town-wide Water System Improvements Design Manager | Engineer | Town of Royalton | Royalton, NY | 2020 - Ongoing Town of Lewiston | Lewiston, NY | 2018 David acted as the design manager for a multi-year Dave assisted in the detailed design for the replacement multi-phased project to expand the Town’s water of approximately 45,000 feet of various size water distribution system. The project(s) included mains. Assisted with pipeline alignment, materials of approximately 80,000 LF of new water distribution piping construction, and assembly of all contract documents. between 8- and 12-inch diameter. Dave was responsible Responsible for coordinating all permitting efforts with various entities T +1 716 362-8802 | E [email protected] www.ghd.com Page 155 of 301