Text · page 156 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
David Woolley | QA/QC - Water 30-Inch Raw Watermain Replacement Project Hamburg Victory Avenue Waterline Engineer | Replacement City of Lockport | Lockport, NY | 2018 Engineer | Assisted in the detailed design for the replacement of Village of Hamburg | Hamburg, NY | 2015 approximately 12,000 feet of 30-Inch raw watermain. Dave completed the detailed design and preparation of The raw watermain is City’s only source of water and the contract documents for the replacement of a waterline in project was declared an Emergency Situation; therefore, Hamburg, NY. Assisted in design of the waterline and in depth consideration was given to maintaining water was responsible for acquiring all necessary agency supply to the City through construction sequencing. approvals. Dave assisted with pipeline alignment, materials of construction, and assembly of all contract documents. South New York Street Waterline Replacement Responsible for coordinating all permitting efforts with various entities. Dave was also the lead Contract Engineer | Administrator throughout the construction phase of the City of Lockport | Lockport, NY | 2015 project and coordinated between involved parties and Responsible for the design and assembly of technical tracked budgets. specifications for the upgrade and replacement of a waterline in Lockport, NY. Coordinated with City officials Water Tank Painting Project and other agencies to acquire necessary approvals. Engineer | Town of Pendleton | Pendleton, NY | 2017 Parsons Development Area Water Transmission Main Phase 2 Valve Chamber Repairs Dave completed the detailed design and preparation of contract documents for the exterior painting and Engineer | rehabilitation of a water storage facility in Pendleton, NY. Regional Municipality of Wood Buffalo | Fort Design Engineer for the necessary rehabilitation and McMurray, AB | 2015 painting, and was responsible for acquiring all necessary Dave aided in the design and permitting for repairs to a agency approvals valve chamber on a water transmission main. He was responsible for assembling technical specifications and Water Tank Interior Painting Project assisted in submittal reviews. Engineer | Town of Pendleton | Pendleton, NY | 2016 Career history Completed the detailed design and preparation of 2015 – present GHD, Civil Engineer/Civil contract documents for the interior painting and Engineering Design Manager - rehabilitation of a water storage facility in Pendleton, NY. Northeast Assisted in design of the necessary rehabilitation and painting and was responsible for acquiring all necessary 2014 - 2015 PCS Crane & Rigging Company, agency approvals. Intern 2013 - 2014 Clark Patterson Lee Design Water System Improvements Professionals, Intern Engineer | Town of Eden | Eden, NY | 2016 Dave was responsible for the preparation and assembly of the U.S. Army Corps of Engineers Joint Application for Permits. The permit covered various watermain crossings under Eighteen Mile and Ryther Creeks. T +1 716 362-8802 | E [email protected] www.ghd.com Page 156 of 301