Southtowns Record

TBA01.26.2026packet

Government
Town of West Seneca
Board
Town Board
Meeting
Jan 26, 2026, 6:00 p.m.
Posted by publisher
Jan 23, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Budget and taxes, Public safety, Parks and recreation, Zoning and land use, Roads and traffic, Audits and oversight, Housing

Original document

Same meeting

Text · page 161 of 301

Read the whole document on one page (all 301 pages, each with its own heading)

Jaron Case, PE
Funding Assistance/Stormwater

Office Location  Experience
Syracuse, New York  10 years

Qualifications/Accreditations
– BS, Civil Engineering, 2015
– AS, Engineering Science, 2013
– Registered Professional Engineer (Water Resources and Environmental): New York
Memberships
– American Society of Civil Engineers
– New York Water Environment Association

Relevant experience summary
  Jaron has 10 years of experience in the evaluation, design, permitting, funding, bidding, construction, and post-
  construction phases of wastewater and water engineering projects for municipal and private clients. Jaron’s
  work experience in the wastewater industry includes work on municipal WWTP, pump station, forcemain, and
  gravity sewer projects, and work on municipal watermain replacement projects in the drinking water industry.
  Jaron provides permitting and funding support for municipal wastewater and drinking water projects. Jaron also
  has provided site and stormwater design services for municipal and private sector projects.

  electrical buildings, new odor control systems, site
Pump Station Rehabilitation Program – Cove  improvements, and screenings removal. Jaron’s
Road and Edgewater Point (Phase 2)  responsibilities included project management,
  contractor and resident field representative
Project Engineer / Project Manager |  coordination, design reviews, submittal review,
Westchester County | Mamaroneck, New York  responding to contractor inquires, permitting, asset
Design phase services for an approximately  management services, and team collaboration.
$5.8 million pump station upgrade project in the Village  Construction was completed in late 2021.
of Mamaroneck, NY. The project includes
improvements to two pump stations consisting of  Water System Improvements
equipment upgrades, flood mitigation improvements,  Project Engineer |
new wetwells, building improvements, site  Village of Skaneateles | Skaneateles, New York
improvements, and the installation of an approximately
400 feet 6-inch diameter forcemain. Jaron’s  Bidding and construction phase services for an
responsibilities include project management,  approximately $4 million water system improvements
evaluations, vendor reviews, design calculations,  project in the Village of Skaneateles, NY. The project
specification development, drawing review, cost  included the replacement of approximately 12,600 LF
estimation, permitting, stormwater calculations, report  of existing watermain piping, 220 water services, and
development, and team collaboration. The project is  28 fire hydrants. The project also included a complete
anticipated to bid for construction in late 2023.  reconstruction of East Lake Street, including the
  replacement of approximately 1,300 LF of storm
Pump Station Rehabilitation Program – East  sewers, approximately 1,200 LF of sanitary sewers,
Basin, West Basin, and Edgewater Point  water system improvements, drainage improvements,
  and paving. The project included permitting and work
Project Engineer / Project Manager |  along NYSDOT roads and four NYSDOT road
Westchester County | Mamaroneck, New York  crossings. Jaron’s responsibilities included submittal
Construction phase services for an approximately $6.7  review, contractor coordination, permitting, and on-site
million pump station upgrade project in the Village of  construction administration services. Jaron also
Mamaroneck, NY. The project included improvements  assisted with project management services including
to three pump stations consisting of equipment  client communication and leading progress meetings.
upgrades, flood mitigation improvements, new  The project was completed in late 2020.

T 315 802 0273 | E [email protected]
315 802 7
  www.ghd.com

  Page 161 of 301