Text · page 161 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
Jaron Case, PE Funding Assistance/Stormwater Office Location Experience Syracuse, New York 10 years Qualifications/Accreditations – BS, Civil Engineering, 2015 – AS, Engineering Science, 2013 – Registered Professional Engineer (Water Resources and Environmental): New York Memberships – American Society of Civil Engineers – New York Water Environment Association Relevant experience summary Jaron has 10 years of experience in the evaluation, design, permitting, funding, bidding, construction, and post- construction phases of wastewater and water engineering projects for municipal and private clients. Jaron’s work experience in the wastewater industry includes work on municipal WWTP, pump station, forcemain, and gravity sewer projects, and work on municipal watermain replacement projects in the drinking water industry. Jaron provides permitting and funding support for municipal wastewater and drinking water projects. Jaron also has provided site and stormwater design services for municipal and private sector projects. electrical buildings, new odor control systems, site Pump Station Rehabilitation Program – Cove improvements, and screenings removal. Jaron’s Road and Edgewater Point (Phase 2) responsibilities included project management, contractor and resident field representative Project Engineer / Project Manager | coordination, design reviews, submittal review, Westchester County | Mamaroneck, New York responding to contractor inquires, permitting, asset Design phase services for an approximately management services, and team collaboration. $5.8 million pump station upgrade project in the Village Construction was completed in late 2021. of Mamaroneck, NY. The project includes improvements to two pump stations consisting of Water System Improvements equipment upgrades, flood mitigation improvements, Project Engineer | new wetwells, building improvements, site Village of Skaneateles | Skaneateles, New York improvements, and the installation of an approximately 400 feet 6-inch diameter forcemain. Jaron’s Bidding and construction phase services for an responsibilities include project management, approximately $4 million water system improvements evaluations, vendor reviews, design calculations, project in the Village of Skaneateles, NY. The project specification development, drawing review, cost included the replacement of approximately 12,600 LF estimation, permitting, stormwater calculations, report of existing watermain piping, 220 water services, and development, and team collaboration. The project is 28 fire hydrants. The project also included a complete anticipated to bid for construction in late 2023. reconstruction of East Lake Street, including the replacement of approximately 1,300 LF of storm Pump Station Rehabilitation Program – East sewers, approximately 1,200 LF of sanitary sewers, Basin, West Basin, and Edgewater Point water system improvements, drainage improvements, and paving. The project included permitting and work Project Engineer / Project Manager | along NYSDOT roads and four NYSDOT road Westchester County | Mamaroneck, New York crossings. Jaron’s responsibilities included submittal Construction phase services for an approximately $6.7 review, contractor coordination, permitting, and on-site million pump station upgrade project in the Village of construction administration services. Jaron also Mamaroneck, NY. The project included improvements assisted with project management services including to three pump stations consisting of equipment client communication and leading progress meetings. upgrades, flood mitigation improvements, new The project was completed in late 2020. T 315 802 0273 | E [email protected] 315 802 7 www.ghd.com Page 161 of 301