Jaron Case, | Funding Assistance/Stormwater

Pump Station Upgrade Program – Walden  Water System Improvements
Woods, Jefferson Valley, Jefferson Park  Project Engineer |
Project Engineer / Project Manager |  Town of Macedon | Macedon, New York
Town of Yorktown | Yorktown, New York  Construction phase services for an approximately $1.6
Construction phase services for an approximately $2.4  million water system improvements project in the Town
million pump station upgrade project in the Town of  of Macedon, NY. The project included the replacement
Yorktown, NY. The project included improvements to  of approximately 6,500 LF of existing watermain
three pump stations consisting of new prefabricated  piping, approximately 85 water services, and the
pump station buildings, wetwell improvements,  addition of approximately 900 LF of new 8-inch HDPE
equipment upgrades, electrical upgrades, new sanitary  piping and approximately 1,100 LF of 8-inch PVC
sewer infrastructure, and site improvements. Jaron’s  piping. The project included permitting and work along
responsibilities included project management,  NYSDOT roads and several NYSDOT road crossings.
contractor and resident field representative  The project also included the decommissioning of a
coordination, design reviews, submittal review,  500,000-gallon water storage tank located in an
responding to contractor inquires, permitting, design  existing cemetery. Jaron’s responsibilities included
calculations, and team collaboration. Construction was  onsite construction administration services, submittal
completed in early 2020.  review, contractor and client coordination, and
  responding to contractor inquiries. Construction was
  completed in mid-2018.
Western Wayne County Regional WWTP
Project Engineer |  West Lake Road Sanitary Sewer
Wayne County Water and Sewer Authority | Wayne  Improvements
County, New York
  Project Engineer |
Preliminary engineering design phase services for  City of Syracuse | Skaneateles, New York
sanitary sewer infrastructure to convey wastewater
from the Town of Marion and Town Macedon WWTPs  Construction phase services for an approximately
to a new consolidated WWTP in the Village of  $300k sanitary sewer improvements project for the
Palmyra. The project proposed to decommission the  City of Syracuse in Skaneateles, NY. The project
Town of Marion and Town of Macedon WWTPs and  included the installation of an approximately 1,800 LF
repurpose into pump stations for sanitary sewer  of 1½ and 2-inch low-pressure forcemain and sanitary
conveyance to the new consolidated WWTP. Jaron’s  sewer improvements in the Skaneateles Lake
responsibilities included the development of alternative  Watershed. Jaron’s responsibilities included daily
forcemain routings, pump station sizing, cost  onsite construction administration services, submittal
estimation, evaluation of O&M costs, permitting, and  review, contractor and client coordination, and
report development. The work was completed in mid-  responding to contractor inquiries. Construction was
2018.  completed in late 2016.

T 315 802 0273 | E [email protected]
315 802 7
  www.ghd.com

  Page 162 of 301