Text · page 163 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
Lisa J. Derrigan PE Regulatory/Permitting Location Experience Buffalo, New York, USA 30 years Qualifications/Accreditations – M.S., Civil Engineering, 1993 – B.S., Civil Engineering, 1991 – Registered Professional Engineer: New York Memberships – Water Environment Federation – New York Water Environment Association, President – New York Section American Water Works Association Relevant experience summary Lisa is a dedicated professional with 30 years of experience encompassing drinking water and wastewater treatment evaluations, sewage facilities planning, and permit renewal and negotiations with state regulatory agencies. Tonawanda Order on Consent Assistance Consent Order Compliance Engineering Senior Project Engineer | Support Town of Tonawanda WWTP | Tonawanda, NY, USA Senior Project Engineer | Lisa assisted the Town with addressing regulatory Village of Depew | Depew, NY, USA comments on their Infiltration and Inflow (I/I) Lisa assisted with numerous Consent Order compliance Demonstration project, which led to negotiating a revised items for the Village of Depew, which is under Consent Order on Consent with the NYSDEC that provides a new Order to address SSOs in their sanitary sewer system. phased approach to further address I/I and sanitary This includes developing the Village’s Capacity, sewer overflows (SSOs) abatement. Lisa has been Management, Operation and Maintenance (CMOM) assisting the Town with several of the required work plan Plan, the Post-Construction Monitoring Report for the documents including a system wide I/I study, sewer Darwin/Argus area sewer rehabilitation project, the model update, private property I/I program, and other summary report for the System-wide Infiltration/Inflow related documents. Study, and the Work Plan for the Sanitary Sewer System Evaluation Survey (SSES) and Corrective Action Plan SPDES Permit Compliance Assistance (CAP). Lisa also prepared documents in support of funding applications. Senior Project Engineer | Darien Lake Theme Park and Resort | Darien, NY, USA Mount Vernon Sewer System Evaluation Lisa assisted the Darien Lake Theme Park and Resort Peer Reviewer | with review and negotiation of their State Pollutant Town of Hamburg | Hamburg, NY, USA Discharge Elimination System (SPDES) permit renewal Lisa conducted a peer review of the Mount Vernon with the NYSDEC. She also coordinated the I/I study of Sewer District Sewer System Evaluation report. Mount the collection system as required by the permit, including Vernon Sewer District is owned by the Town of Hamburg system flow metering and data evaluations, as well as but operated and maintained by the Erie County Division assisted with the Wastewater Treatment Facility of Sewerage Management. The District was under an (WWTF) evaluations. Order on Consent for the abatement of SSOs. The Town T +1 716 242-6932 | E [email protected] www.ghd.com Page 163 of 301