Southtowns Record

TBA01.26.2026packet

Government
Town of West Seneca
Board
Town Board
Meeting
Jan 26, 2026, 6:00 p.m.
Posted by publisher
Jan 23, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Budget and taxes, Public safety, Parks and recreation, Zoning and land use, Roads and traffic, Audits and oversight, Housing

Original document

Same meeting

Text · page 167 of 301

Read the whole document on one page (all 301 pages, each with its own heading)

Paige Gilliam EIT
Linear Design

Location  Experience
Rye, New York USA  5 years

Qualifications/Accreditations
– BS, Environmental Engineering, 2021
– Engineer-in-Training, New York, 2021
– NYS Endorsed Certificate of Erosion and Sediment Control Training, SWT # 060T-9072021-109

  Memberships  Awards
  – North American Society for Trenchless Technology  – NASTT 2025 “Trenchless Rising Star”
  (NASTT)
  – Water Environment Federation (WEF)
  – New York Water Environment Association (NYWEA)

Relevant experience summary
 Paige joined GHD in 2020, and has experience in the planning, design, and construction of multi-disciplinary
 infrastructure projects, specializing in linear pipeline systems. Paige will lead the linear design components
 water and sewer projects. Her recent experience includes large-diameter transmission and conveyance
 pipelines of various materials including HDPE, PVC, and Steel, with focus in alignment routing and complex
 crossings. Paige specializes in design of trenchless installations, particularly horizontal directional drilling
 (HDD).

West Side Interceptor Relief Pump Station &  West Side Sewer Extension
Forcemain  Design Engineer/Construction Administration |
Design Engineer |  South & Center Chautauqua Lake Sewer Districts |
Town of Amherst | Amherst, NY, USA  Chautauqua, NY, USA
The West Side Interceptor project consists of a new  The West Side Sewer Extension consists of extending
wet weather overflow, new 15 million gallons per day  an existing sewer district along the west side of
(mgd) sanitary sewage pump station, and more than  Chautauqua Lake. New infrastructure consists of
2 miles of 24-inch forcemain. The project is in a sub-  approximately 150,000 LF of 2-6" HDPE, 75,000 LF of
urbanized area with numerous utility conflicts, and it  8/10" HDPE, 750 grinder pumps, six new pumping
consists of six auger bore installations, and the critical  stations, and all associated appurtenances.
Ellicott Creek pipe utility bridge crossing, which is  Responsibilities included hydraulic calculations,
along a NYSDOT-owned bridge, with steep  pipeline sizing and routing, the design of horizontal
embankments, and has challenging soil conditions.  directional drilling (HDD) installations, and
Paige completed routing and constructability analysis,  development of detailed design drawings and technical
size/material selection, settlement analysis, and profile  specifications, and construction cost estimates. Paige
design, and the development of detailed design  is currently leading construction administration for
drawings and technical specifications, and bidding  Phase 2.
phase services.
  Van de Water 48-Inch Finished Water
Peanut Line Interceptor Project  Transmission Main
Design Engineer |  Engineer| Erie County Water Authority |
Town of Amherst | Amherst, NY, USA  Tonawanda, NY, USA
Paige was responsible for the civil design of 3,750 LF  The VDW Transmission Main consists of a new 48-
of 24 and 30-inch gravity sewer, flow control  inch carbon steel delivered water transmission pipeline
structures, and flow metering. Design aspects included  in the Towns of Tonawanda and Amherst NY. Paige
precast vault sizing, gravity sewer alignment,  was responsible for the preliminary and detailed
installation methods.  design of approximately 18,000 feet of 48-inch steel

T +1 570 317-9128 | M 201 575-9196 | E  www.ghd.com