Text · page 167 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
Paige Gilliam EIT Linear Design Location Experience Rye, New York USA 5 years Qualifications/Accreditations – BS, Environmental Engineering, 2021 – Engineer-in-Training, New York, 2021 – NYS Endorsed Certificate of Erosion and Sediment Control Training, SWT # 060T-9072021-109 Memberships Awards – North American Society for Trenchless Technology – NASTT 2025 “Trenchless Rising Star” (NASTT) – Water Environment Federation (WEF) – New York Water Environment Association (NYWEA) Relevant experience summary Paige joined GHD in 2020, and has experience in the planning, design, and construction of multi-disciplinary infrastructure projects, specializing in linear pipeline systems. Paige will lead the linear design components water and sewer projects. Her recent experience includes large-diameter transmission and conveyance pipelines of various materials including HDPE, PVC, and Steel, with focus in alignment routing and complex crossings. Paige specializes in design of trenchless installations, particularly horizontal directional drilling (HDD). West Side Interceptor Relief Pump Station & West Side Sewer Extension Forcemain Design Engineer/Construction Administration | Design Engineer | South & Center Chautauqua Lake Sewer Districts | Town of Amherst | Amherst, NY, USA Chautauqua, NY, USA The West Side Interceptor project consists of a new The West Side Sewer Extension consists of extending wet weather overflow, new 15 million gallons per day an existing sewer district along the west side of (mgd) sanitary sewage pump station, and more than Chautauqua Lake. New infrastructure consists of 2 miles of 24-inch forcemain. The project is in a sub- approximately 150,000 LF of 2-6" HDPE, 75,000 LF of urbanized area with numerous utility conflicts, and it 8/10" HDPE, 750 grinder pumps, six new pumping consists of six auger bore installations, and the critical stations, and all associated appurtenances. Ellicott Creek pipe utility bridge crossing, which is Responsibilities included hydraulic calculations, along a NYSDOT-owned bridge, with steep pipeline sizing and routing, the design of horizontal embankments, and has challenging soil conditions. directional drilling (HDD) installations, and Paige completed routing and constructability analysis, development of detailed design drawings and technical size/material selection, settlement analysis, and profile specifications, and construction cost estimates. Paige design, and the development of detailed design is currently leading construction administration for drawings and technical specifications, and bidding Phase 2. phase services. Van de Water 48-Inch Finished Water Peanut Line Interceptor Project Transmission Main Design Engineer | Engineer| Erie County Water Authority | Town of Amherst | Amherst, NY, USA Tonawanda, NY, USA Paige was responsible for the civil design of 3,750 LF The VDW Transmission Main consists of a new 48- of 24 and 30-inch gravity sewer, flow control inch carbon steel delivered water transmission pipeline structures, and flow metering. Design aspects included in the Towns of Tonawanda and Amherst NY. Paige precast vault sizing, gravity sewer alignment, was responsible for the preliminary and detailed installation methods. design of approximately 18,000 feet of 48-inch steel T +1 570 317-9128 | M 201 575-9196 | E www.ghd.com Page 167 of 301