Paige Gilliam | Linear Design finished water transmission main with numerous Lake Ontario Water Treatment Plant Phase 2 trenchless crossings including an 1,800-feet microtunnel. The microtunnel consisted of 1,800 LF of Technical Advisor | 48-inch steel transmission main within a 60-inch steel Onondaga County Water Authority | casing to cross a town-owned golf course. Oswego, NY, USA Responsibilities include settlement, buckling, and The Lake Ontario Water Treatment Plant (LOWTP) is buoyancy calculations, significant constructability a 60 mgd nominal capacity (72 mgd-rated capacity) considerations, evaluation of shaft locations, direct filtration plant. Phase 2 Clearwells & Backwash development of detailed design plans and Tank Project consisted of new finished water piping to specifications, and construction cost estimates. and from the two new clearwell tanks. Piping included 72-inch steel inlet piping (from the new finished water Rio Dell distribution box) and new 60-inch steel outlet piping to connect to the existing 60-inch steel PCCP finished Trenchless Engineer | water line. Paige was responsible for guiding the steel City of Rio Dell | Rio Dell, CA, USA pipe design calculations, drawings, and specifications. The City of Rio Dell Drinking Water Infrastructure Improvement Project consists of the replacement of Harrison Town-Wide SSES Improvements the City’s failing watermain of various pipe materials Phase 1B and diameters. Paige was responsible for designing six HDD installations during the construction phase, in Design Engineer | which the Contractor’s preferred installation method Town of Harrison | Harrison, NY, USA differed from the final design. The HDDs range from Harrison SSES Improvements addresses the Town’s 300 LF to 800 LF of 18-inch thru 12-inch HDPE and issue of I/I in the sanitary sewer system. The project FPVC. includes MH inspections and sanitary sewer inspection footage review to determine recommended Belmont Lift Station and Forcemain rehabilitation methods. Paige was responsible for technical specifications, design drawings, and Trenchless Engineer | construction cost estimates. Rehabilitation includes Charlotte Water | Charlotte, NC, USA open cut and trenchless rehabilitation methods for Belmont Forcemain project involves approximately sanitary sewer pipeline and MH improvements. Paige 12,000 LF of new 24-inch PVC transmission main. provided construction and design phase services Paige was responsible for the HDD design to cross including construction administration, CCTV review, Paw Creek and a railroad. The HDD consisted of identifying I/I sources, scheduling open-cut sanitary 1,300 LF of two parallel 30-inch HDPE sanitary sewer sewer replacement, open-cut spot and service lateral forcemains with steel casing under the railroad portion. repairs, manhole replacement and rehabilitation, and The entire HDD was through bedrock. Paige was sanitary sewer CIPP lining installation. responsible for HDD alignment and profile design, significant constructability considerations, staging Career history locations, and development of detailed design drawings. 2020 – present GHD, Engineer Big Run Water Treatment Plant Finished Water Transmission Main Trenchless Engineer | Pennsylvania-American Water Company | Punxsutawney, PA, USA Paige was responsible for the horizontal directional drilling (HDD) design of approximately 650 LF of 16- inch HDPE finished water main to cross the Mahoning Creek and a NYSDOT-owned bridge. A critical component of the HDD is the limited space for staging and drilling operations. One side of the bridge was a highly populated residential neighbourhood, and the other side of the bridge was steep road embankments. T +1 570 317-9128 | M 201 575-9196 | E www.ghd.com Page 168 of 301