Text · page 169 of 301
Read the whole document on one page (all 301 pages, each with its own heading)
Daniel Kolkmann AS Senior Construction Administrator Location Experience Buffalo, New York, USA 46 years Qualifications/Accreditations – AS, Engineering, 1984 – AAS, Construction Technology, 1982 Key technical skills – Constructability Reviews – Contract Administration – Construction Claim and Litigation Assistance Relevant experience summary Dan leads our Buffalo construction services group and has more than 45 years of experience in the inspection, contract administration, and construction management of municipal water and wastewater facility and infrastructure projects. Responsibilities have included: review of bid proposals, overseeing receipt/responses to requests for information from prospective bidders, advising/making recommendations to the Client regarding contract award, overseeing the construction of Projects. Dan also manages contractor progress payment recommendations, shop drawing review/processing, and provides consultation relative to substitutions and design modifications. of the test area. The project including cured in place pipe Town Jobs 3089 and 3107 – Sanitary Sewer Lining lining of 32,400 linear feet of sanitary sewers. The (Various Locations) sewers ranged in size from 8 – 15 inches. The work also Senior Contract Administrator | included rehabilitation of 80 manholes along point Town of Tonawanda | Tonawanda, NY, USA repairs and grouting lateral connections to new CIPP liner. Dan provided contract administration and oversaw resident inspection staff during the CIPP and manhole lining of sanitary sewers in the Town of Tonawanda for Parker Fries Interceptor Sewer Project two Town projects. Contract Administrator | – Job 3089 included approximately 115,500 LF of Town of Tonawanda | Tonawanda, NY, USA sanitary sewers and approximately 562 manholes. Dan was Construction Manager for this 7 year, multi Several other streets were developed as alternate bid phased sewer interceptor replacement project, which items to allow for the completion of additional areas if consisted of: funding was available. – Phase 1 Constructability Review, Bid, and – Job 3107 included 115,000 LF of sanitary sewers and Construction Phase Services. Dan was responsible approximately 422 manholes. for contract administration and oversight of resident inspection for this major sewer interceptor Infiltration and Inflow Demonstration Project replacement, which included installation of Contract Administrator | approximately 48,000 linear feet (LF) of gravity sewer Town of Tonawanda | Tonawanda, NY, USA to replace undersized and deteriorated sewers. Pipe sizes ranged from 12 to 84 inches in diameter, with Dan provided contract administration and oversaw approximately 18,000 feet of pipe larger than resident inspection staff during the sewer rehabilitation 36 inches in diameter. Installed depths of piping T +1 716 856 2142 | M +1 716 491-3804 | E [email protected] www.ghd.com Page 169 of 301