Daniel Kolkmann | Senior Construction Administrator

  ranged up to 55 feet by open cut and tunnel boring  Van De Water Delivered Water Transmission
  machine (TBM) pipe jacking installation methods. The  Improvements
  project included new sanitary sewer overflow (SSO)
  chambers, manholes, overflow structures, and a new  Constructability Review
  flow monitoring system, as well as the replacement of  Erie County Water Authority | Amherst and
  approximately 6,000 LF of 12-inch PVC watermain.  Tonawanda, NY
  This $30 million project was successfully completed  Dan provided constructability guidance during design of
  on time and below the initial bid amount.  the ECWA’s two transmission main segments within the
– Phase 2 Bid and Construction Phase Services. Dan’s  Tonawanda Mudflats. The second and final segment to
  efforts included lead assistance in defense of the  be completed is between the Colvin Tank located near
  construction contract award recommendation / bid  Colvin Boulevard and the I-290/I-990 Interchange. The
  protest through legal depositions and testimony,  project involves construction of two 48-inch diameter
  which prevailed through the State Supreme Court,  transmission mains from the VDWTP to BPS, providing
  Appellate Division. Dan was responsible for contract  redundancy for this critical infrastructure, as well as
  administration and oversight of resident inspection for  additional capacity for future use, if ever required.
  the installation of approximately 4,000 feet of 30-inch
  diameter sewer pipe replacement, and approximately  2018 Water System Improvement Project
  2,000 feet each of 24 and 18-inch sewer pipe by open
  Construction Contract Administrator
  cut method. Project also included cast in place lining
  Town of Lewiston | Lewiston, NY
  of approximately 1,700 feet of existing 30-inch sewer
  pipe. The $10 million project was successfully  Dan provided constructability guidance during design,
  completed on time and below the initial bid amount.  and provided contract administration and oversaw
  resident inspection for the installation of approximately
– Phase 3 Bid and Construction Phase Services.
  44,000 linear feet of 8-inch, 12-inch, and 16-inch
  Constructability Review, Bid, and Construction Phase
  watermains, hydrants, valves and appurtenances to
  Services. Dan was responsible for contract
  replace existing waterlines in various areas of the Town
  administration and oversight of resident inspection.
  of Lewiston, New York.
  Project involved installation of approximately 5,500 LF
  of 42-inch diameter sewer pipe replacement,
  approximately 1,000 LF of 24- to 36-inch and  Mountain View Drive Water System
  3,200 LF of 12 through 18-inch sewer pipe by open  Improvements
  cut method. Project also includes cast in place lining  Construction Manager
  of approximately 1,500 LF of existing sewer pipe and  Town of Lewiston | Lewiston, NY
  associated manhole and SSO chambers, including full
  pavement replacement and resurfacing of all affected  Dan provided supervision for the installation of
  areas upon completion of pipe installations.  11,260 LF of 8-inch PVC watermain and associated
  appurtenances. Construction took place in a very
– Phase 4 Bid and Construction Phase Services. Dan  affluent area within the Town consisting of multi-million
  was again instrumental in defense of the construction  dollar homes with special features that needed to be
  contract award recommendation / bid protest through  taken into consideration. Restoration was a key concern,
  legal depositions and testimony, which prevailed  and it was imperative that construction had as little
  through the State Supreme Court. Project includes  negative impact on the area and its residents as
  installation of approximately 12,000 LF of 18 through  possible.
  36-inch diameter sewer pipe replacing existing
  interceptor lines, 12 storm sewer overflow chambers,
  and resurfacing of all affected areas upon completion  Career history
  of pipe installations. The project also includes the  2003 – present  GHD, Senior Project Administrator
  addition of an 800 kW diesel emergency generator at
  the Parker Pump Station.  1986 – 2003  R&D Engineering, PC, Construction
  Manager
  1977 – 1985  Stimm Associates, Inc., General
  Contractors and Engineers

T +1 716 856 2142 | M +1 716 491-3804 | E [email protected]  www.ghd.com