Daniel Kolkmann | Senior Construction Administrator ranged up to 55 feet by open cut and tunnel boring Van De Water Delivered Water Transmission machine (TBM) pipe jacking installation methods. The Improvements project included new sanitary sewer overflow (SSO) chambers, manholes, overflow structures, and a new Constructability Review flow monitoring system, as well as the replacement of Erie County Water Authority | Amherst and approximately 6,000 LF of 12-inch PVC watermain. Tonawanda, NY This $30 million project was successfully completed Dan provided constructability guidance during design of on time and below the initial bid amount. the ECWA’s two transmission main segments within the – Phase 2 Bid and Construction Phase Services. Dan’s Tonawanda Mudflats. The second and final segment to efforts included lead assistance in defense of the be completed is between the Colvin Tank located near construction contract award recommendation / bid Colvin Boulevard and the I-290/I-990 Interchange. The protest through legal depositions and testimony, project involves construction of two 48-inch diameter which prevailed through the State Supreme Court, transmission mains from the VDWTP to BPS, providing Appellate Division. Dan was responsible for contract redundancy for this critical infrastructure, as well as administration and oversight of resident inspection for additional capacity for future use, if ever required. the installation of approximately 4,000 feet of 30-inch diameter sewer pipe replacement, and approximately 2018 Water System Improvement Project 2,000 feet each of 24 and 18-inch sewer pipe by open Construction Contract Administrator cut method. Project also included cast in place lining Town of Lewiston | Lewiston, NY of approximately 1,700 feet of existing 30-inch sewer pipe. The $10 million project was successfully Dan provided constructability guidance during design, completed on time and below the initial bid amount. and provided contract administration and oversaw resident inspection for the installation of approximately – Phase 3 Bid and Construction Phase Services. 44,000 linear feet of 8-inch, 12-inch, and 16-inch Constructability Review, Bid, and Construction Phase watermains, hydrants, valves and appurtenances to Services. Dan was responsible for contract replace existing waterlines in various areas of the Town administration and oversight of resident inspection. of Lewiston, New York. Project involved installation of approximately 5,500 LF of 42-inch diameter sewer pipe replacement, approximately 1,000 LF of 24- to 36-inch and Mountain View Drive Water System 3,200 LF of 12 through 18-inch sewer pipe by open Improvements cut method. Project also includes cast in place lining Construction Manager of approximately 1,500 LF of existing sewer pipe and Town of Lewiston | Lewiston, NY associated manhole and SSO chambers, including full pavement replacement and resurfacing of all affected Dan provided supervision for the installation of areas upon completion of pipe installations. 11,260 LF of 8-inch PVC watermain and associated appurtenances. Construction took place in a very – Phase 4 Bid and Construction Phase Services. Dan affluent area within the Town consisting of multi-million was again instrumental in defense of the construction dollar homes with special features that needed to be contract award recommendation / bid protest through taken into consideration. Restoration was a key concern, legal depositions and testimony, which prevailed and it was imperative that construction had as little through the State Supreme Court. Project includes negative impact on the area and its residents as installation of approximately 12,000 LF of 18 through possible. 36-inch diameter sewer pipe replacing existing interceptor lines, 12 storm sewer overflow chambers, and resurfacing of all affected areas upon completion Career history of pipe installations. The project also includes the 2003 – present GHD, Senior Project Administrator addition of an 800 kW diesel emergency generator at the Parker Pump Station. 1986 – 2003 R&D Engineering, PC, Construction Manager 1977 – 1985 Stimm Associates, Inc., General Contractors and Engineers T +1 716 856 2142 | M +1 716 491-3804 | E [email protected] www.ghd.com Page 170 of 301