2025 SWMM Model Update
  The challenge
Client  The NCSD is a consortium of six communities that own, operate and
Niagara County Sewer District No. 1  maintain a centralized interceptor sewer system, seven remote pumping
  stations, and a water pollution control center (WPCC). While the NCSD is
Location  responsible for operating and maintaining the interceptor sewers and
Niagara County, New York, USA  pump stations noted above, each member Town is responsible for the
  maintenance and operation of their individual systems. The entire sewer
Date  collection system, including interceptor sewers, consists of more than
  285 miles of pipe. As retained engineer for the NCSD since 2004, GHD
February 2025-Ongoing  has assisted the NCSD Board and staff with engineering services as
  needed to maintain the system and meet regulatory requirements.
Value
  Recently, the southern portion of the Town of Lockport has experienced
Engineering: $169,300
  significant growth in subdivision construction in recent years, with
  numerous new developments already completed and several more
  proposed. This growth has and will lead to a greater demand on the
  District-owned interceptor system in that area. Concerns have been raised
  that these additional flows could lead to sewer and pump capacity issues
  in the Town of Lockport and the adjacent Town of Pendleton.