Southtowns Record

TBA01.26.2026packet

Government
Town of West Seneca
Board
Town Board
Meeting
Jan 26, 2026, 6:00 p.m.
Posted by publisher
Jan 23, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Budget and taxes, Public safety, Parks and recreation, Zoning and land use, Roads and traffic, Audits and oversight, Housing

Original document

Same meeting

Text · page 95 of 301

Read the whole document on one page (all 301 pages, each with its own heading)

EXPERIENCE

Village of Akron
Wastewater Treatment Facility Upgrades
GRANT FUNDED

Location: Akron, NY  To comply with updated NYSDEC discharge permits,
Client: Village of Akron  CPL conducted a disinfection study and secured
Completion Date: 2023  $450,945 in grant funding through the Water
  Quality Improvement Project (WQIP) program. A UV
  disinfection system was selected to eliminate chemical
CPL was engaged to evaluate the Village of Akron’s  costs and the need for dechlorination.
Wastewater Treatment Facility (WWTF) and determine
cost-effective upgrade options. A preliminary  After a critical failure in 2018, the aging RBC system
engineering study was completed, and CPL helped  was replaced in Phase 1. Phase 2 included a new
secure $1.49 million in grant funding and a 30-year 0%  headworks building, UV disinfection, HVAC and roofing
interest loan through the Clean Water State Revolving  improvements, new digester system, screw pumps,
Fund (CWSRF) to implement the improvements.  site lighting, and a waste gas burn-off system.

Originally built in 1964 and upgraded in 1986,
the facility remains well-maintained but requires
modernization. Key upgrades include a new headworks
facility with a mechanical bar screen, hydrodynamic
grit separator, and flume flow meter to improve
treatment reliability. Anaerobic digesters will receive
new covers and a mixing system to address biogas
leaks, and the screw pumps and equalization basin
mixer will be upgraded.