DRAFT
  ECSD No. j Board of Managers
  February I l, 2026 Meeling Minutes
  Page 2 of 6

continues in the 'soft' winter shutdown, with the remaining activities associated with the ORF
influent piping, addressing the punch list, and frnal restoration. Contractors / sub-contractors
have completed some work on punch list items, as well as commencing demobilization from the
site. Arcadis, the project consulting engineer, has presented a few options for the Division of
Sewerage Management (DSM) to consider regarding the problem with the new flow meter and
the location of its access hatch (referenced during the last Board meeting). Those options are
presently under review. Contract No. 8l - the Soutltowns AWTF Pre-Phase 2 Electrical project
- has not commenced major onsite activities as most of the work includes equipment with long
lead times. Contract No. 82 - the Southtowns AWTF Landfill Reclamation project is complete,
and approval for close out is being requested under Item 5.b. Arcadis will be providing a
required engineering report for Contract No. 82 for the New York State Department of
Environmental Conservation's (NYSDEC's) revieWapproval.

  The DSM received word that its application for a Water Quality Improvement Project
(WQIP) grant for Phase 2 was not selected; during a debriefing, the DSM was advised it was a
very competitive year, and it should re-apply during the next grant cycle.

  Phase 2 construction continues to be on hold until the new SPDES permit is in place. A
draft permit from the NYSDEC was received in December 2025 and the DSM's comments are
included under Item 6.d. The DSM reached out to the NYSDEC for a status update on the draft
permit last week but has yet to receive a response. Arcadis continues to address items regarding
the project, such as potential changes with adoption of new building codes in 2026.

  Environmental Facilities Comoration Water Infrastructure ImDrovement Grant
  Award (Handout)

  The Southtowns AWTF Phase 2 project was awarded a $25 million grant from the New
York State Environmental Facilities Corporation (NYSEFC). The DSM has been providing the
NYSEFC various documents and paperwork required for the grant.

  b.  Steuben Foods

  The DSM received notice it was awarded a FAST-NY Track "B" grant from Empire
State Development for the Elma Pumping Station and Force Main Upgrades project. The DSM
has had two (2) meetings with Empire State Development to discuss their requirements, and it is
hoped a request for proposals for the associated engineering work may be released in the next
month or two.

ITEM NO. 5 - NEW BUSINESS

  a.  Pavments (Handout)

  The Board reviewed a copy of the payments on a handout for the month of February
2026. On a motion by Mr. Keding, seconded by Mr. Millar, the Board voted to approve the
February 2026 payments. The motion carried, 7 - 0.