Southtowns Record

​8/11/26 Board Packet

Government
Village of Gowanda
Board
Village Board
Meeting
Aug 11, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Public safety, Budget and taxes, Roads and traffic, Zoning and land use, Parks and recreation, Audits and oversight

Original document

Same meeting

Text · page 19 of 56

Read the whole document on one page (all 56 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Village of Gowanda
  Summary of Water System Preliminary Engineer's Report ~ Project Status Update
  Augus 11, 2026 - Village Board Meeting
  Prepared: August 4, 2026

25310 - (V) Gowanda Water System Preliminary Engineer's Report
  ©  Site Visits and Meetings:
  o 04/14/26 - Village Board Meeting
  °o  07/10/26 ~ Review Preliminary Alternatives with Mark Burr
  0  07/28/26 - Conf. call with Cattaraugus County DOH Bob Ring
  ©  07/30/26 ~ Conf. call with DOH Bureau of Water Supply Protection Will Grady

  e  Task 1: Engineering Study and Report

  o  Hydrant flow testing was completed and existing condition water modeling
  completed for the system.

  o  We have gained a good understanding of the current water system. We have
  assessed the condition and compliance of system assets. It should be noted that an
  overwhelming majority of deficiencies are due to the age of the water system. We
  have prepared four (4) alternatives to present in the PER to address the deficiencies
  within the water system:
  « Alternative 1 ~No Action: EFC Engineering Report Outline requires a “No
  Action” alternative to be presented. This altemative proposes the Village
  continue to maintain the current system.

  «  Alternative 2 - Upgrades to Water System Infrastructure: Upgrades to the
  Village  sources  are  proposed,  this  includes  a new  well  house.  This
  alternative proposes upgrades to existing water system and addresses
  minimum deficiencies. This alternative replaces problematic pipes within
  the distribution system.

  *  Alternative 3 - New Treatment Plant and Finished Water Storage: Higher
  level of upgrades to the Village sources are proposed, this includes a new
  well house. This alternative proposes a new water treatment plant with
  new finished water storage tanks for reliable and resilient production of
  drinking water. This alternative replaces problematic pipes within the
  distribution system.

  «  Alternative 4 - New Treatment Plant and Finished Water Storage w/
  Additional Distribution Piping: Higher level of upgrades to the Village
  sources are proposed,  this includes a new  well house. This alternative
  proposes new water treatment plant with new finished water storage tanks
  for reliable and resilient production of drinking water. This alternative
  replaces problematic pipes, all piping smaller than 6” where fire protection
  is provided by the water system, and pipes greater than 75 years old.

  Lof2