Text · page 20 of 56

Read the whole document on one page (all 56 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Village of Gowanda ~ Project Summary Sheet - August 11, 2026

  o  Preliminary Engineer’s Report is advancing in following areas:
  Project Background and History - Completed
  System Present Condition and Deficiencies ~ Completed
  Alternative Analysis - Preliminary alternatives have been assembled. Sizing of
  infrastructure, system calculations, and preliminary layouts are being developed.
  Cost analysis for alternatives is ongoing. Coordinating with vendors for pricing
  and space and power requirements.

  o  Summary of Meeting with DOH Bureau of Water Supply Protection (7/30/26)
  The Village historically has had barium in its groundwater well source.
  Barium is known to be found in groundwater throughout the greater
  region.
—

  The Village has previously blended sources to maintain barium levels
  below the maximum contaminant level (MCL) under permission from the
  DOH.
  DOH BWSP is now requiring projects receiving funds under DWSRF to
  have full flow treatment capabilities of contaminants.
  New equipment will be required to treat for barium at peak daily or design
  flow rates of the existing plant or new treatment plant.

  Please contact me via phone or email with any questions or comments regarding this update or
  our service,

  Respectfully,

  Jake Alianello, P.-E.
  Partner/Project Manager

  MDA Consulting Engineers, PLLC
  PO Box 604, 3 Bristol Lane
  Ellicottville, New York 14731
  Office Phone: 716-699-4650

  File: 28310  2 of 2