Southtowns Record

​8/11/26 Board Packet

Government
Village of Gowanda
Board
Village Board
Meeting
Aug 11, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Public safety, Budget and taxes, Roads and traffic, Zoning and land use, Parks and recreation, Audits and oversight

Original document

Same meeting

Text · page 25 of 56

Read the whole document on one page (all 56 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

WENDEL  CONTRACTORS
REAR BUILDING
Metal Roof  $  7,992  §  113,520  $  115,200  Insurance reviewing numbers to see why we are so far apart. Cupola needs to be
Office Shingle Roof Shed roof)  §  7,829  $  14,256  $  13,760 Addressed. Will review contractor estimates.
Siding  $  19,190  §  20,839  §  13,200
Facia/ Gutters  $  6600  §  6,000
Windows & Doors  23,453  $  12,012  §  21,000
Cupola  $  5,068  §  13,800
Electrical  1,008  §  1,452  §$  750
  39,471  $  $  183,710
VILLAGE MAIN  EXTERIOR
Roof  $  171,674  $  179,467  $  136,384  Windows and Roof are close. Lighting can be quoted to be replaced on the front of
Exterior Lantern Lighting  $  4,673  $  .  $  _  the building. Question the metal panels on the front and where they are included?
Exterior Metal Panels  §  -  $  13,017  $  16,800
Windows Replace Front  $  46,427  §  69468  = §$  49,000
Windows  Framing Wrap - Left  §  8,139  Asbestos and  Lead Testing complete and identified.  We need to
  $  230,913  $  262,852  §  202,184  secure an abatement contractor. Insurance will only cover up to $50,000. This could
  be a $100,000+ expense.  Insurance has nothing inchided to date
  Windows replacement is included, however, we will need to address structural
  issued relating to the detexiorating lintels. ‘This can be looked at during const
  as a supplemental if needed. Will be reviewed.
VILLAGE  MAIN  - FIRST FLOOR
Entry  $  ~  $  1,705  §  2,220  This was reviewed and will be updated for ceiling tile replacement, and electrical
Hallway  §  -  $  2,054  §$  2,060  fixtuses revewed. HVAC ductwork, insulation, and cleaning to be reviewed by
Office  $  7  §  919  1,97  ‘surance company.
Board Room  $  -  $  380  §  1,512
  $  -  $  5,059  §  7,770
  Note:
  Estimates do NOT taclude the street ight globes. The globe quote to
  has been submitted to insurance adjustor who will ialcude replacement and
  Jabor in updated estimate.  Will be applied to lighting project.