Southtowns Record

​8/11/26 Board Packet

Government
Village of Gowanda
Board
Village Board
Meeting
Aug 11, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Public safety, Budget and taxes, Roads and traffic, Zoning and land use, Parks and recreation, Audits and oversight

Original document

Same meeting

Text · page 26 of 56

Read the whole document on one page (all 56 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

VILLAGE  MAIN - SECOND  FLOOR
Flooring  $  13,097  $  50,061  $  25,500  Flooring and ceiling to be reviewed.
Celing  $  20,024  §¢  41,384
 Walls  $  $  4538  §  7,895
Blinds  $  $  990  1,200
HVAC  $  392  §  8,092
Electrical  $  68  $  4,700
Misc/Cleaning  4,218
  $  30,615.  §  90,773  $  88,771
POLICE  STATION
Floor  $  7,003  $  6,653  §$  The Insurance quote is lacking HVAC, duct work repair in the police station,
Ceiling  $  5,198  §$  20,865  §  insulation etc.  Wendel included ceiling grid replacement while insurance only
HVAC  covers minimal ceiling tile replacement? Ing to consider HVAC  work, repairs,
  $  5,930  $  9,504  $
  replacement that could potentially damage grid work, tiles cannot be matched?
HVAC Room  $  22,902  $
Electrical  $  5,670  §$
Painting, cleaning, move furniture, Cor  $  2,037  7,960  §
  $  20,168  §  554  §
EMERGENCY  WORK  31,358  §$  -  $  -  Emergency work includes roof repairs and boarding up windowns.  Has been
  submitted and waiting?  Check has been issued on 8/5/26
GENERAI CONDITIONS  $  39,584  §$  -  $  -  7 included in all Wendels numbers
  $  412,110  = $  605,985  $§$  550,125
  RD
ABATEMENT  REQUIRED  198,000  Estimate