Text · page 28 of 56
Read the whole document on one page (all 56 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
_ QDJSIHELD CONTINUED - Shingle Roofing DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV —DEPREC. ACV 19. R&R Flashing - pipe jack 1.00EA 91.93 0.00 18.38 110.31 (53.65) 56.66 20. R&R Flashing - L flashing - color 63.92 LF 8.95 0.00 14.42 686.51 (344.71) 341.80 finish Left Side Stairs Roof 21, Remove 3 tab - 25 yr. - comp. shingle 1.39SQ 124.40 0.00 34.58 207.50 (0.00) 207.50 roofing - w/out felt 22. 3 tab - 25 yr. - comp. shingle roofing - 1,678Q 339.21 0.00 113.30 679.78 (566.48) 113.30 w/out felt 23. Roofing felt - 15 lb. 3.49S8Q 52.56 0.00 36.68 220.11 (183.43) 36.68 24, R&R Drip edge 65.75 LF 4.87 0.00 64.04 384.24 (L9L.6L) 192.63 25. Asphalt starter - universal starter 65.75 LF 2.70 0,00 35.30 313.03 (177.53) 35.50 course 26. Step flashing 27.83 LF 16.28 0.00 90.62 543.69 (323.62) 220.07 Totals: Shingle Roofing 0.00 1,304.84 7,829.13 4,577.63 3,251.50 Front Elevation DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACV SIDING 27. R&R Siding - vinyl 534,00 SF 7.24 - 0.00 773.22 4639.38 (1,326.46) 3,312.92 Measurements taken from HOVER report (SI-1, SI-6, SI-9) 28. R&R House wrap (air/moisture barrier) 534.00 SF 0.62 0.00 66.22 397.30 (35.60) 361.70 SOFFIT, FASCIA, & GUTTERS 29. R&R Fascia - metal - 6" 32.16 LF 8.81 0.00 56.68 340.01 (102.91) 237.10 30. Detach & Reset Soffit - vinyl 32.16 SF 4.72 0.00 30.36 182.16 (0.00) 182.16 WINDOWS & DOORS ‘ 31. R&R Wrap wood garage door frame & 68.42 LF 23.98 0.00 328.16 1,968.87 (520,26) 1448.61 trim with aluminum (PER LF) 32. R&R Wrap wood window frame & 2.00 EA $21.75 0.00 208.70 1,252.20 (337.74) 914.46 trim with aluminum sheet - Large 33. Overhead door weather stop 68.42 LF 4.32 0.00 59.12 354.69 (168.90) 185.79 MISCELLANEOUS 34. Siding - General Laborer - per hour 2.00 HR 108.75 0.00 43.50 261.00 (0.00) 261.00 Additional labor hours to frame off fixtures with j channel Totals: Front Elevation 6.00 1,565.96 9,395.61 2,491.87 6,903.74 GOWANDA 6/12/2026 Page: 3