Text · page 29 of 56
Read the whole document on one page (all 56 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
@ISIHELD Total: Hover Sketch (GOWANDA) (GOWANDA) 0.00 9,911.78 59,470.85 23,071.26 36,399.59 Total: Rear-Building 0.00 9,911.78 59,470.85 23,071.26 36,399.59 Main Building Hover Sketch (GOWANDA) Exterior Roofl 408.00 Surface Area 4.08 Number of Squares 101.36 Total Hip Length DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC, ACV No visible damage noted during site mspection Totals: Reofl 0.00 0.00 0.00 0.00 0.00 Roof2 2.64 Surface Area 0.03 Number of Squares 5.36 Total Perimeter Length DESCRIPTION QUANTITY UNIT PRICE TAX O&P RCV DEPREC. ACY MAIN ROOF 46. Remove Rubber roofing - Perimeter 18.87 SQ 121,33 0.00 457,90 2,747.40 (0,00) 2,74740 adhered system - 60 mil 47, R&R Single-ply membrane - Fully 20.76 SQ 748.25 0.00 3,106.74 18,640.41 (13,124.46) 6,515.95 adhered system - 60 mil 48. R&R Fiberboard - 1" 1,887.00 SF 291 0.00 1,098.24 6589.41 (2,849.37) 3,740.04 49. Insulation - ISO board, 2" 20.76 SQ 325.09 0.00 1,349.78 8,098.65 (1,124.81) 6,973.84 50. R&R Insulation - ISO board, 3 1/2" 20.76 SQ 638.81 0.00 2,652.34 15,914.03 (1779.24) 14,134.79 51. R&R Flash parapet wall only - 188.25 LF 22.90 0.00 $62.18. S.173.11 (3,411.09) 1,762.02 PYVC/TPO - up to 3' 52. R&R Drip edge - PVC/TPO clad metal 123,33 LF 8.44 0.00 208.18 1,249.09 (674,79) 374,30 53. R&R Exhaust cap - through flat roof - 2.00 EA W716 0.00 68.46 410.78 (213.84) 196.94 PVC/TPO/Rubber - Large* GOWANDA 6/12/2026 Page: 5