5105.43 xB NEW YORK STATE DEPARTMENT OF TRANSPORTATION BETTERMENT REQUEST (Betterment Worksheet, Design Deposit Estimate) damaged foundations with new foundations, conduit, conductor wire and light fixture. The Village will not supply any material for the project. The reason for the betterment request: NYSDOT and the Village of Gowanda agree it is in the best interest of both parties to have NYSDOT design, prepare pians, quantify, estimate, and construct the project by NYSDOT contractor. The Village of Gowandia, in the interest of the best use oftheir resources, has agreed to a betterment to NYSDOT to let and award a contract fora lighting betterment contract for the Village. : - The work limits (stations) and length of the bettermentare: The responsibilities of the’various stakeholders: “ NYDOT may provide, upon request from the stakeholder, design for only municipal water, sanitary, and drainage facilities, but not for other municipal facilities. NYSDOT will never provide designs to for-profit owners. NYSDOT wil not hire consultants to provide designs for facilities the NYSDOT normally does not design. The betterment design work is to be done by: The Village chose the fixtures, NYSDOT has prepared the design plans, quantities, and estimate, The standards being used are: 680 The items (materials) are being supplied by: NYSDOT Contractor The betterment construction work is to be done by: NYSDOT Contractor The inspection will be done by: NYSDOT BET RE Sensed L025 Daracaar 2 2180 Page 2 of 6