Southtowns Record

10/13/26 Board Packet

Government
Village of Gowanda
Board
Village Board
Meeting
Oct 13, 2026
Kind
Agenda packet
Topics
Audits and oversight, Water, sewer and drainage, Public safety, Budget and taxes, Roads and traffic, Zoning and land use, Parks and recreation

Original document

Same meeting

Text · page 16 of 90

Read the whole document on one page (all 90 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

5105.43  xB

  NEW YORK STATE DEPARTMENT OF TRANSPORTATION
  BETTERMENT REQUEST
  (Betterment Worksheet, Design Deposit Estimate)

The betterment is to be processed as:  XI Items and Laborin the contract
  C] Fixed Price Lump Sum
  Design Betterment Deposit Estimate

 1.  Engineer's Item and Labor Cost Estimate
  Includes 24 619.01 - wzTc, C] 697.03 - Field Change Payment.  $795,090.00
 2.  Engineer's Labor Cost Estimate for Adjustment of Items
  (materials) Provided by the Stakeholder.  $0.00
  NYSDOT costs: XI Actual  L1 10% of Item 1  ‘
  Note:  ~
 3.  See item and Labor Cost Estimate by NYSDOT below.  Total of Lines  land 2  $795,090.00

 4. Work Zone Traffic Control Cost, Ttem 619.01
  X1$0.00, included in Line 3 or (1 $0.00. the State's cofitractor’s WZIC-  $0.00
  does not need to be modified to accomplish the betterment work.

 5.  Field Change Payment, Item 697.03.  $39,754.50
  LI Actual  KX] 5% of Line 3 [1] $0.00, Inciuded in Line 3.  ou_

 6.  Total of Lines3 to 5  |  $834,844.50

 7.  &  NYSDOT Design Engineering Services Cost:
  L] Actual X] 0% of Line 6  $0.00
  [1 $0.00, Stakeholder provided the design.
  Note:

 8.  NYSDOT Construction Supervision (12% of Line 6)  $100,181.34

 9.  Mobilization, Item 699.040001  (4% of Line 6)  $33,393.78

 10.  Total of Lines6 to 8  $968,419.62

 11. Less amount paid  $0.00

  initial Betterment Payment Due  |  $968,419.62

* Include these costs in the betterment share in the Estimator.