Text · page 23 of 90
Read the whole document on one page (all 90 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Highway Department Monthly Report Weekly Duties-Summer Road maintenance and repair- pot hole repair, general road resurfacing and complete road milling/paving Repair/improve damaged or sunken storm drains Crosswalk stripping- 26 crosswalks Biweekly garbage pickup- 39 garbage receptacles in the village Set up and weekly maintenance of 27 flower pots throughout the village Weekly mowing, weed trimming and clean up of 12 parks/parking lots and village guardrails Tree trimming, planting and tree removal Removal of sediment under South Chapel bridge Street sweeping- all village streets and parking lots Maintenance and cleaning of 2:amphitheaters Move brush from Palmer dump site to cemetery hill site September 8th-October 13th 1. Drainage repair, blacktop repair and skid pave the bad areas on Cemetery Hill. 85 ton/ blacktop 2. Removed old concrete pad, basketball hoops and telephone pole at St. John’s for new splash pad installation. Prepared drainage for new splash pad. NAAP Fixed plugged up storm drain on E Hill St. Fixed storm drain on Crestwood Removed large damaged tree at Chang Hu Park. Patched potholes in the Hollywood Theater parking lot between W Main and Jamestown St