Text · page 24 of 90
Read the whole document on one page (all 90 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Sewer Department Board Meeting Report October 2026 Treated 17.895 million gallons of sewage Received 138,025 gallons of septage Daily Operations Performed: e Twice daily sampling and visual inspections e Sludge pumping operations Ongoing Responsibilities: Weekly permit compliance sampling Scheduled maintenance tasks and repairs performed on _ process equipment Grounds maintenance and upkeep Tank cleaning Sewer maintenance and flushing Attended training sessions for licensure requirements This month additionally we have: Completed Monthly DMR for NYSDEC Marked dig notices Jamie Wilson completed water class Ben Latimore started 9/14/2026. He has been learning both sewer and water department daily operations as well as training on the vac truck Assisted water department with repairs to the water leak on Caroline St and others in the Town of Collins Assisted Town of Collins highway department with culvert pipe flushing. Located and verified splashpad drain is open and flowing to the sanitary sewer on Aldrich St.