Text · page 26 of 90
Read the whole document on one page (all 90 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
wende September 2, 2026 Village of Gowanda Mayor Mark Nephew 27 East Main Street Gowanda, New York 14070 SUBJECT: VILLAGE OF GOWANDA WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT PHASE 2 PROFESSIONAL ENGINEERING SERVICES PROPOSAL ADDITIONAL DESIGN, BIDDING AND SERVICES DURING CONSTRUCTION Dear Mayor Nephew: Wendel WD Architecture, Engineering, Surveying & Landscape Architecture P.C. (Wendel) is pleased to submit this proposal for professional services for the Wastewater Treatment Plant Improvements Projects - Phase 2. Work included is comprised of ferric tank and Aldrich PS engineering support (design, engineering during construction and resident observation) and Phase 2 engineering support (bidding, grant support (to be completed going forward), engineering during construction, and residertt observation services). The ferric tank and Aldrich PS upgrades are being completed as a change order to Phase 1 and Phase 2 capital improvements are included in the WIIA grant project scope that the Village has grant (WHA and BIL) and CWSFF joan funding for. The Phase 2 project has received approval from NYSDEC and NYSEFC and is ready to be bid. The schedule submitted to NYSEFC calls for the project to be bid in December of 2026. The projected project cost in the engineers report that was submitted to DEC for approval was $4,192,150. Pp 2 Proj Primary Clarifier Upgrades (1 and 2) i Lighting and Electrical Upgrades | Secondary Clarifier Upgrades Trickling Filter Upgrades (1 and 2) Anaerobic Digester Upgrades and Safety Equioment It should be noted that this project has multiple funding sources and grant programs that are relied on to offset project costs that require services to be provided beyond a typical construction project, We propose to perform the scope of work below. ARCHITECTURE | ENGINEERING [| ENERGY EFFICIENCY | CONSTRUCTION MANAGEMENT