Southtowns Record

10/13/26 Board Packet

Government
Village of Gowanda
Board
Village Board
Meeting
Oct 13, 2026
Kind
Agenda packet
Topics
Audits and oversight, Water, sewer and drainage, Public safety, Budget and taxes, Roads and traffic, Zoning and land use, Parks and recreation

Original document

Same meeting

Text · page 26 of 90

Read the whole document on one page (all 90 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

wende

September 2, 2026

Village of Gowanda
Mayor Mark Nephew
27 East Main Street
Gowanda,  New York 14070

SUBJECT:  VILLAGE OF GOWANDA WASTEWATER TREATMENT PLANT
  IMPROVEMENTS PROJECT PHASE 2
  PROFESSIONAL ENGINEERING SERVICES PROPOSAL
  ADDITIONAL DESIGN, BIDDING AND SERVICES DURING
  CONSTRUCTION

Dear Mayor Nephew:

Wendel  WD  Architecture,  Engineering,  Surveying & Landscape  Architecture P.C. (Wendel)  is pleased  to
submit this proposal for professional services for the Wastewater Treatment Plant Improvements Projects -
Phase 2. Work included is comprised of ferric tank and Aldrich PS engineering support (design, engineering
during construction and resident observation) and Phase 2 engineering support (bidding, grant support (to
be completed going forward), engineering during construction, and residertt observation services). The ferric
tank and Aldrich PS upgrades are being completed  as a change order to Phase 1 and Phase 2 capital
improvements  are included  in the WIIA grant project scope that the Village has grant (WHA and  BIL) and
CWSFF joan funding for. The Phase 2 project has received approval from NYSDEC and NYSEFC and is ready
to be bid.  The schedule submitted to NYSEFC  calls for the project to be bid in December of 2026.  The
projected project cost in the engineers report that was submitted to DEC for approval was $4,192,150.

Pp  2 Proj

Primary Clarifier Upgrades (1 and 2)  i
Lighting and Electrical Upgrades  |
Secondary Clarifier Upgrades
Trickling Filter Upgrades (1 and 2)
Anaerobic Digester Upgrades and Safety Equioment

It should be noted that this project has multiple funding sources and grant programs that are relied on to
offset project costs that require services to be provided beyond a typical construction project, We propose to
perform the scope of work below.