Text · page 30 of 90
Read the whole document on one page (all 90 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
VILLAGE OF GOWANDA | WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT - PHASE 2 SDC Fee Notes: 1) Expenses such as plotting/printing costs, postage, local mileage, and telephone charges are included in the fee. 2) Should Wendel be required to perform additional services beyond those outlined above, Wendel shail be compensated on an hourly or fixed sum basis for a mutually agreed scope of services. 3) Our fee and schedule proposal is valid for 60 days. If we do not receive a signed notice to proceed before that date, we reserve the right to re-evaluate our proposal. E, TERMS: This proposal, the attached “Appendix A” (Professional Services Terms and Conditions), and the attached NYSEFC Terms and Conditions for Non-Construction Projects are intended to represent the entire contractual relationship. Please contact me If you have any questions. If this proposal is acceptable to you, please indicate your acceptance by signing both originals and return one (1) executed original to our office. Respectfully Submitted, Wendel Brian M. Sibiga, PE Jesse F, Wendell, PE Director of Wastewater Energy Services Vice President, Engineering Principal Ene. Should Wendel’s proposal be accepted, Wendel WD Architecture, Engineering, Surveying & Landscape Architecture P.C., a New York State licensed architecture and engineering firm that is part of a consolidated group of Wendel Companies, will contract to undertake the work. Qur letterhead and plans will still prominently say “Wendel” and we will refer to ourselves as Wendel throughout the project. ACCEPTANCE / AUTHORIZATION: Accepted this day of ,20 Print Name: Signature: Title: wendelcompanies.com