Southtowns Record

SUPPORTING DOCUMENTS 2B-5H

Government
Town of Aurora
Board
Town Board
Meeting
Aug 10, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Roads and traffic, Audits and oversight, Parks and recreation, Energy and data center siting

Original document

Same meeting

Text · page 10 of 81

Read the whole document on one page (all 81 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Short Environmental Assessment Form
  Part 1 - Project Information
Instructions  for  Completi

Part 1 — Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.

Complete all items in Part 1. You may also provide any additional information you believe will be needed by or useful to the lead
agency; attach additional pages as necessary to supplement any item.

  Part 1 — Project and Sponsor Information

 Contractor: GreenSpark Solar | Project: Residential Ground Mount Solar Expansion
  Name of Action or Project:
 Rob Fontaine - Residential Ground Mount Solar Expansion
  Project Location (describe, and attach a location map):
 2100 Lewis Road, South Wales, NY 14139
  Brief Description of Proposed Action:
  Installation of a residential ground mount solar system expansion comprised of 16 SEG Yukon
  N-Series Modules.

  Name of Applicant or Sponsor:  Telephone: (585) 265 - 2384 Ext. 108

  GreenSpark Solar  uy,
  op  E-Mail: [email protected]
  Address:
  176 East Main Street
  City/PO:  State:  Zip Code:
  Rochester  NY  14604
  1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance,  NO  YES
  administrative rule, or regulation?
  If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that  CI
  may be affected in the municipality and proceed to Part 2. If No, continue to question 2.
  2. Does the proposed action require a permit, approval or funding from any other government Agency?  NO  YES
  If Yes, list agency(s) name and permit or approval:
  TOA Bob, RRMAKT  L]i  Y
  3.  a. Total acreage of the site of the proposed action?  27.40  acres
  b. Total acreage to be physically disturbed?  0.001  acres
  c. Total acreage (project site and any contiguous properties) owned
  or controlled by the applicant or project sponsor?  -  27.40  acres

  4,  Check all land uses that occur on, are adjoining or near the proposed action:
  Urban  [®] Rural (non-agriculture)  [2]  Industrial [[]  Commercial [1]  Residential (suburban)
  [[] Forest  [x] Agriculture  [|  Aquatic  [_]  Other(Specify):
  [_] Parkland

  Page 1 of 3  ,  SEAF 2026