Southtowns Record

SUPPORTING DOCUMENTS 2B-5H

Government
Town of Aurora
Board
Town Board
Meeting
Aug 10, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Roads and traffic, Audits and oversight, Parks and recreation, Energy and data center siting

Original document

Same meeting

Text · page 14 of 81

Read the whole document on one page (all 81 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

-
 7.04 KW-DC SOLAR EXPANSION PV GROUND MOUNT SYSTEM  GREEN SPARIC
  476 €, Maine St,
  FOR 2100 LEWIS RD, SOUTH WALES, NY 14139
  Rochester MV MeO
  Phene, 585-265-798"

  Cio
  BY
  5/29/26
  DATE
EPC  DRAWING INDEX
  DBA. GREENSPARK SOLAR  GENERAL
SUSTAINABLE ENERGY DEVELOPMENTS  7-000  TITLE SHEET
176 E MAIN ST.
ROCHESTER, NY 14604

  DESCRIPTION
  ARRAY

  INITIAL
  A-101  SITE LAYOUT
  A-102  GROUND SCREW LAYOUT
SYSTEM SUMMARY:  A-103  PROPERTY LAYOUT
  A-104  EQUIPMENT DATA SHEET
TOTAL DC SYSTEM SIZE  EXISTING: 13.52KWODC & NEW: 7.04 KWDC
TOTAL AC SYSTEM SIZE  EXISTING: 14 KWAC & NEW: 5.76 KWAC
  ELECTRICAL
  €-101  THREE LINE DRAWING
MODULE MODEL  EXISTING: KYOCERA KD2650GX-LFB2  te
  €-102  ELECTRICAL CALCULATIONS  DETAILS
  NEW: SEG SOLAR, YUKON N SERIES SEG-440-BTD-BG 440W, UL61703  Slaie-preimpear
  is
  ax
  fin
  £-103  LABELING DETAIL
MODULE QUANTITY  EXISTING: (52)
  NEW: (16)
MODULE TILT  NEW: 30°  I  ‘ wee Serese  _  Mane  5
  Lacka warne),  fen  ai  2  BAwa
MODULE AZIMUTH  NEW: 180°  -  >  <i
  ca)  aren
  a, 8
  &  me
  !  al tw  Naira)
  a
  : & sqdze  8
INVERTER MANUFACTURER  EXISTING: SMA AMERICA
  NEW: SMA AMERICA  Eat  res  Wales Cente  a  Vong
INVERTER MODEL  EXISTING: SMA SUNNYBOY SB7O000TL-US, ULT741
  w  ,  rc)
  NEW: SBSE5.8-US-50, 5.76kW, UL1741-SB  Scratton
INVERTER QUANTITY  EXISTING: (2)
  Swvkerrville  a)
  neva
  @  os
SCOPE OF WORK:
  -  eet Fas
  ret
  Borin Boston  i)  rect Java  u  =
  o  :
  a  ra
The new (2) DC strings will be combined in the existing DC trench. There will be a new DC  od  ay
trench from the new PV array to the existing array, The new SMA system will be
  a
  calnen
  ;
  Ketend
  - "Sele
  :
  vem
  gi,  =
  x
  a
interconnected in the 200A ATS and will be separate from the existing line-side tap in the  dew
  &ra
  hj
  ww2
200A MSP.  ut
  w
  ot
  cr
Refer to the page A-102 or SML stamped plan-set in order to coordinate ground screw spacing.  =e  e
  2