Southtowns Record

SUPPORTING DOCUMENTS 2B-5H

Government
Town of Aurora
Board
Town Board
Meeting
Aug 10, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Roads and traffic, Audits and oversight, Parks and recreation, Energy and data center siting

Original document

Same meeting

Text · page 15 of 81

Read the whole document on one page (all 81 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Existing Array. om  oe  ie  Ke  |
  PV System Details  TT.  |
  (52) Kyocera 260W  PV Modules.  r  } ESET
  “  fe  j>t-  ft:
- System Size:  Existing: 13.52 OC New: 7.04kW-DC
  Front South Array: —-_  .  PRE. Abate SA.
  Higchester #0 1660
  Existing: KYOCERA KD260GX-LFB2, (52) Units, New: SEG SOLAR,  AN  Nw  Phone: $B5-265-2 384
  (16) SEG 440W PV Modules.
* Module:  YUKON N SERIES SEG-440-BTD-BG 440W, UL61703, (16) Units  SN \  ss fe
  180° Azimuth, 30° Tilt, 90% TSRF  A  ete  fo]  »  “J
—_——  Existing: SMA SUNNYBOY SB7GOOTL-US, 7.GkW, UL1741 (2) Units,  =
  New ~35'DC Trench—
  ed
  oS *  cane thce cr Anes
 rier er es  New: SMA, SBSE5.8_US-50, 5.76kW, UL1741-SB (1) Unit
  *  _
  Exterior South Array: OC Disconnect-—y. B  —_
Racking:  ironRidge, XRIGOO Clear
  |  :  / NN\ \ NX _  ary
  Existing “425° BC Trench--~  7
- Foundation:  American Ground Screws  4  |
  WY  SA

  cD
  \ By
  180° Azimuth & 30° Tilt  4  Sls]
: Orientation:
  vo

  5/23/26
  Notes:  a

  DATE
  =n  an  aoe
  Ail equipment to be installed in accordance with the manufacturers installation  ff
  /
  instructions.  a  String 1 String 2
  All equipment tocations are approximate and require field verification.  x  oo
  gem  7  “  a  \
  Confirm the DC Trench, Array Location & BOS location with the customer.  c  _l  a
  a
  The bottorn leading edge of the array will be ~10" from the ground due to the  as  {  =

  DESCRIPTION
  # NITIA! 1
  lronRidge engineering and 30 degree tilt of the array.
  (  P.

  ie
  Distance between the equipment is not drawn to scale, Refer to A-102 fora  4
  more accurate array location.
  Key:
  ~
  }  oo
  i  Solar Module  ¢
  *) te
  a  PDO  pe  pm  pm  tr  pis
  oC.  ):  &iy
  PV Inverter  e
  a
  aa
  [se  |  Main  Service Panel
  Cas]  Autornatic Transfer  tit  rs  Bi
  Switch  t
  .  zi  ®  fai  aa
  Utility Meter
  ian
  C c)
  Zz ia}  |
  Gow  Bh
  ac | AC Combiner Panel

  =
  ee]  PV DC Discannect
  I]  PV  AC Disconnect
  he  por
  ee*  oe
  fiat
  es]
  Exterior South West House Wall——___  &
  a
  heal
  Utility Meter  e
  a.
  =
  we
  A  &a
  re
  8  = >
  Interior South West Basement Wall:  tg  Bol
  te  pe
  Existing: (2) SMA Inverter, AC Combiner, AC  a)
  w
  %  5
  wh
  ef
  Disconnect, ATS & MSP,  a
  &
  &
  wo  oe
  New: SMA  Inverter, Fused AC Disconnect & Point  pi  3  fey
  oa  a  de
  of Interconnection  gw
  oe
  i
  &
  ©  igweap owdpe E IEScoy
  wap  es  fl  oo
  to]  =  teh  a
  Ey  |  mm  LR  A
  Yok 4
  PORAWNG Mase
  AW