Southtowns Record

SUPPORTING DOCUMENTS 5A1-5D3

Government
Town of Aurora
Board
Town Board
Meeting
Sep 14, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Audits and oversight, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 14 of 31

Read the whole document on one page (all 31 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Short  Environmental Assessment Form
  Part I - Project Information
Instructions for Completing

Part | — Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part | based on
information currenUy available. If addilional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.

Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the
lead agency; attach additional pages as necessary to supplement any item.

 Part 1 — Project and Sponsor Information

 Name of Action or Project:

  Dos, War  * gracmeng panos)
 Project Location (describe, and attach a location maj):
  SSB  BsteYo  (RAL
  Brief Description of Proposed Action:

  9,  gaooraig  & sto),

  Name of Applicant or Sponsor:  Telephone} ify _ (yg S2-FO2
  Y
Reha.
Address:
  Au mM ais how  E-Mail: lacey lermunshamap leaun’ |
  ese Pa reloads Ra.
  City/PO:  State:  Zip Code:
  Foss Aucoank  wy  jJosa
  1.  Does the proposed action only involve the legislative adoption of a plan, local law, ordinance,
  administrative rule, or regulation?  NO  YES
  If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that
  may be affected in the municipality and proceed to Part 2. If no, continue to question 2.  a  LJ
  2. Does the proposed action require a permit, approval or funding from any other government Agency?  NO  VES
  If Yes, list agency(s) name and permil or approval:  ;  7
  TK  Bier, pedir?AS ohesaze  t]  [v]
  3.  a. Total acreage of the site of the proposed action?  erie ,  acres  y
  b. Total acreage to be physically disturbed?  ore  acres
  c. Total acreage (project site and any contiguous properties) owned
  or controlled by the applicant or project sponsor?  q AG  acres

  4,  Check all Jand uses that occur on, are adjoining or near the proposed action:
  []Urban  [7]  Rural (non-agriculture)  [1  Industrial bef Commercial [7]  Residential (suburban)
  [7] Forest  [[] Agriculture  [] Aquatic  [CJ  Other(Specify):
  [~] Parkland

  Paps  PoP 3  SEAF 2019