Text · page 13 of 27
Read the whole document on one page (all 27 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
SESSION 4A Bridge Solutions Adrienne LiBritz- Cooley 3:30 PM Accelerating Short Span Bridge Delivery Dr. Jason Lloyd with Premanufactured Modular CIP Methods to Improve Network Resilience 4:00 PM Practical Tools for Efficient Local Steel Dan Snyder Bridge Design and Delivery 4:30 PM Precast Concrete Slabs for Short Span Ron Thornton Bridge Replacement SESSION 4B WILL BE HELD IN BOOKMAKERS DIN! ROOM SESSION 4B Local Agency Forum Aevo: Rooney 3:30 PM Breakout Session for Municipal Engineers, Municipal L-:.ariment Heads and Their Staff Only. Invited A --iicy Staff to Atter) © Answer Questions 5:00 PM NETWORKING SESSION Bookmakers Lounge THURSDAY. OCTOB ER 22, 2926 7:00-8:00 am BREAKFAST Convention Center 7:30-8:30am REGISTRATION Backstretch Lobby SESSIONS 6L OR HELD IN (HE CONVENTION CENTER 8:30 AM Leos Agency ~aport Kevin Rooney SESSION § ‘ale TBD Andy Clark 8:45 AM Avoor:. Replacemeni ofa Simple Bridge: Nick Rescigno Garay “treet Bridge over Fallkill Creek O15 4 SD TBD Oo AM Jur Bridge. ermit and Inventory Procedure Corinna Myers- Herring 10:16 20 BRE ..« Convention Center SESSION» 7a TBD David Orr 10:45 AM Repair, Reinforce, Repeat: A Long-Term Logan Bessel and Strategy for Bridge Preservation; Wilson-Burt Eric Stein Bridge over 18 Mile Creek Case Study. 11:15 AM County Road 62 over Ischua Creek Culvert Bill Fox and Rob Replacement Fleming 11:45 AM TBD TBD 12:15 PM Final Wrap-up Brenda Crudele