Text · page 80 of 117
Read the whole document on one page (all 117 pages, each with its own heading)
Queuing and Blocking Report Baseline 09/18/2026 Intersection: 1: Pine St & Girard Ave Movement EB NB SB Directions Served LR LT TR Maximum Queue (ft) 78 84 15 Average Queue (ft) 36 23 1 95th Queue (ft) 61 64 8 Link Distance (ft) 484 544 11 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 0 1 - AM Peak No Build SimTraffic Report Page 3