Text · page 99 of 117
Read the whole document on one page (all 117 pages, each with its own heading)
FILE NAME = I: \Projects\2100\2126 - Village of East Aurora\2126. 003. 003 - Pine Street and Girard Avenue Intersection All-W ay Stop Third Party dleddyReview\2126. 003_Autoturn_Girard-Pine. dgn DATE = 9/14/2026 I: \M icroStation\Bentley V8i\W orkspace\Plot\NYSDOT_SIZE_B_XEROX. tbl TIME = 3: 56: 52 PM I: \M icroStation\Bentley V8i\W orkspace\system\pltcfg\pdf. pltcfg IN CHARGE OF DESIGNED BY CHECKED BY DRAFTED BY CHECKED BY N O T FO R C O N ST R U C TI O N PREPARED BY: BARTON & LOGUIDICE, D.P.C. GIRARD AVENUE (c) 2026 Transoft Solutions, Inc. All rights reserved. AASHTO 2018 (US) S-BUS-40 AASHTO 2018 (US) (c) 2026 Transoft Sol uti ons, I nc. Al l ri ghts reserved. S- BUS- 40 NE STREET PI LAWRENCE AVENUE 0 20 1"=40' GRID NORTH 40 feet PINE STREET AND GIRARD AVENUE NO.DATE BY REVI SION INTERSECTION ALL-WAY STOP REVIEW DRAWING VILLAGE OF EAST AURORA T-6 SCALE:1" = 40' ERIE COUNTY S-BUS-40 UNAUTHORI ZED ALTERATI ON OR ADDI TION TO THI S OVERSTEER 6 PINE STREET DATE ISSUED: 9 / 2026 GIRARD AVE & DRAW I NG I S A VI OLATI ON OF THE NEW YORK STATE 8 EDUCATI ON LAW ARTI CLE 145 SECTI ON 7209