Text · page 12 of 12
Read the whole document on one page (all 12 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Highway Superintendent Report for April 2026 Road Work: Fixed driveway washed out on Blanchard. Opened up 36” driveway pipe on Darien that was plugged with debris. Opened up 12” driveway pipe on Darien. Cleaned out front of culvert pipes on all town roads (heavy rains). Cleaned drop inlet tops in Town. Swept streets. Drag box winter damage. Hot patched holes in town. Equipment: Serviced all 3 RTVs. Serviced snowblower. New starter switch in John Deere tractor. Replaced two bearings on SKAG mower. Replaced hydraulic cylinder on John Deere for drag box. Took 2020 F350 to Emerlings for maintenance. Installed hydraulic filters for Case backhoe. Installed new batteries in Excavator. NYS inspections done on all Town vehicles. Snow Removal: N/A Water: Monthly reports submitted to the Department of Health. Monthly samples submitted to the Department of Health. AWDQR was completed and posted on Town website (copies sent to State and County). Jeremy replacing ceilings in Water St. pumphouse. Did a walk through with potential companies on the Water St. pumphouse rehab project (April 28"). REP for water project to be submitted on May 5". Facilities: Dave Nelligan repaired light in kitchen. Dave ordered a fan for the kitchen. Meeting with Shelden (Signature Sports Surfaces) — going to schedule pickle ball painting when weather allows. Jeremy fixed mini split for Troopers at Town Hall. Jeremy put new chairs together for Town Hall. May Tasks: Finish sweeping roads. Ditching. Hot patch.